![Wacker Neuson WL 50 Operator'S Manual Download Page 158](http://html1.mh-extra.com/html/wacker-neuson/wl-50/wl-50_operators-manual_3112259158.webp)
SE RVICING A ND INSPEC TION
156
Work to be performed
Operating hours:
250, 750, 1000,
1250, 1750,
2000, 2250,
2750, 3000, etc.
Operating
hours: 1500,
2500, 3500,
4500, etc.
monthly
annually
Check ROPS/FOPS structures
x
x
Check the condition of the tires and the tire pressure
x
x
x
x
Change the engine oil and filter
x
x
x
Change the fuel filter – clean the pre-filter
x
x
Clean the fuel feed pump (for Deutz engines)
x
x
Clean the air filter, replace if necessary
x
x
x
x
Change the hydraulic fluid
x
x
Change the hydro return filter
x
x
Pressure filter (first change after 500 op. hours, further changes as
needed)
Change the oil in the transfer case
x
x
Change the oil in the axles
x
x
Change the coolant – every 2 years
Are all the grease nipples lubricated? Lubricate if necessary
x
x
x
x
Lubricate the drive shafts (universal and slip joint)
x
x
x
x
Lubricate all the levers, cables and hinges with oil
x
x
x
x
Summary of Contents for WL 50
Page 1: ...Operator s Manual Wheel Loader WL 50 www wackerneuson com...
Page 2: ...December 08 Edition...
Page 46: ...TECHNICAL DATA 44 Dimensions 3 4 Dimensions Fig 11...
Page 103: ...Operating and operation 101 WL50 Fig 46 Switch for differen tial lock 1 12V 1...
Page 123: ...Operating and operation 121 WL50...
Page 134: ...Towing and transporting 132 Fig 66 Tying down the loader...
Page 243: ...Appendix 241 WL50 For personal notes...
Page 253: ...List of figures 251 WL50...