
SE RVICING A ND INSPEC TION
154
Work to be performed
Operating hours:
250, 750, 1000,
1250, 1750,
2000, 2250,
2750, 3000, etc.
Operating
hours: 1500,
2500, 3500,
4500, etc.
monthly
annually
Check transmission, engine and hydraulic system for leaks
x
x
x
x
Check the hydraulic and water radiators for dirt
x
x
x
x
Check the coolant level and antifreeze
x
x
x
x
Check the tension and condition of the V-belt
x
x
x
x
Check the routing of hoses and pipes
x
x
Check the piston rods for the hydraulic cylinders
x
x
Check the air filter hose
x
x
x
x
Check routing of bowden cables and electrical wiring
x
x
Retighten all screws, observing in particular the engine suspension, the
axle mounting and the drive shaft
x
x
Check the acid level of the battery
x
x
x
x
Clean the battery terminals/check the acid density
x
x
Check: Instruments, indi audible warning devices
x
x
x
x
Check the electrical system
x
x
x
x
Check the foot brake and parking brake, adjust if necessary
x
x
x
x
Check the hydraulic steering
x
x
x
x
Summary of Contents for WL 50
Page 1: ...Operator s Manual Wheel Loader WL 50 www wackerneuson com...
Page 2: ...December 08 Edition...
Page 46: ...TECHNICAL DATA 44 Dimensions 3 4 Dimensions Fig 11...
Page 103: ...Operating and operation 101 WL50 Fig 46 Switch for differen tial lock 1 12V 1...
Page 123: ...Operating and operation 121 WL50...
Page 134: ...Towing and transporting 132 Fig 66 Tying down the loader...
Page 243: ...Appendix 241 WL50 For personal notes...
Page 253: ...List of figures 251 WL50...