9.32 Installing the Hydraulic Tank
Prerequisites
Engine cool
Procedure
Follow the procedure below to install the hydraulic tank.
1. Place a plastic sheet and a container under the machine to collect any liquid which
drains off. Dispose of this liquid in accordance with environmental protection legislation.
2. Connect the hydraulic hoses to the hydraulic tank and position the hydraulic tank into
the frame. Tighten the fittings if loosened during the removal procedure.
3. Install the mounting bracket
(b)
.
4. Install the screws
(c)
that secure the hydraulic tank to the frame.
This procedure continues on the next page.
wc_gr004206
d
e
wc_gr004207
c
c
b
Summary of Contents for RD 12A
Page 1: ...5000192242 02 0912 5 0 0 0 1 9 2 2 4 2 Repair Manual Roller RD 12 EN...
Page 15: ...RD 12 RD 12A Safety Information wc_si000302gb fm 15 1 4 Label Locations X FF...
Page 21: ...RD 12 RD 12A Safety Information wc_si000302gb fm 21 Notes...
Page 25: ...RD 12 RD 12A Operation wc_tx000865gb fm 25 53 47 54 61 50 62 55 wc_gr004114 56...
Page 29: ...RD 12 RD 12A Operation wc_tx000865gb fm 29 wc_gr002951 N F R 55 42 44 54 10 15...
Page 119: ...RD 12 RD 12A Disassembly Assembly wc_tx000671gb fm 119...
Page 120: ...Schematics RD 12 RD 12A wc_tx001073gb fm 120 10 Schematics 10 1 Hydraulic Schematic...
Page 122: ...Schematics RD 12 RD 12A wc_tx001073gb fm 122 10 4 Electrical Schematic A RD 12A...
Page 124: ...Schematics RD 12 RD 12A wc_tx001073gb fm 124 10 6 Electrical Schematic B RD 12A...
Page 126: ...Schematics RD 12 RD 12A wc_tx001073gb fm 126 10 8 Electrical Schematic RD 12...
Page 137: ......