Operation
PG 2A / 3A
20
wc_tx000177gb.fm
4
Operation
4.1
Preparing the Machine for First Use
Preparing for first use
To prepare your machine for first use:
4.1.1
Make sure all loose packaging materials have been removed from the
machine.
4.1.2
Check the machine and its components for damage. If there is visible
damage, do not operate the machine! Contact your Wacker Neuson
dealer immediately for assistance.
4.1.3
Take inventory of all items included with the machine and verify that
all loose components and fasteners are accounted for.
4.1.4
Attach component parts not already attached.
4.1.5
Add fluids as needed and applicable, including fuel, engine oil, and
battery acid.
4.1.6
Move the machine to its operating location.
Summary of Contents for PG 3A
Page 1: ...Operator s Manual Pump PG 3A 5000184874 08 0511 5 0 0 0 1 8 4 8 7 4 EN...
Page 6: ......
Page 16: ...Labels PG 3A 16 wc_si000519gb fm 2 Labels 2 1 Label Locations wc_gr000833 A C D E G H F B...
Page 40: ...Emission Control Systems Information and Warranty 40 wc_tx001753gb fm...
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......