Operation
27
8
Operation
8.1
Prior to starting the machine
After unpacking, the machine is ready for operation.
Checking the machine
f
Check the machine and all components for damages.
Checking the mains
f
Check if mains or power distribution on the construction site have the correct
operating voltage (see nameplate of the machine or chapter
Technical Data
).
f
Check if mains or power distribution on the constructions site are protected
in accordance with current standards and regulations.
8.2
Changing tools
General notes
You can change the tool without additional tools.
Notes on using tools
Only use tools with the following properties:
The tool must be suitable for the tool holder.
The tool end must be undamaged.
The tool must be sufficiently sharp to avoid impact damage.
The tool must be suitable for the intended application.
WARNING
Improper handling can result in injury or serious material damage.
f
Read and follow all safety instructions of this operator's manual, see chapter
Safety information
.
WARNING
Electrical voltage.
Injuries from electrocution.
f
Remove the plug from the plug receptacle before all work on the machine.
Summary of Contents for EH 9 BL
Page 1: ...5000191541 08 0811 5 0 0 0 1 9 1 5 4 1 Operator s Manual Electric Hammer EH 23 27 Low Vib EN...
Page 48: ...14 Glossary 48...
Page 50: ......
Page 51: ......