Chapter
5
,
Operating Instructions: Operating the Machine with the Topside Control Unit
E.H. Wachs Company
Part No. 06-150-520-MAN, Rev. 0-0607
43
Figure 5-37. Before clamping, make sure that both
clamping levers and the cutting lever are in the up
position, and that the clamping direction lever is in the
ENGAGE position.
5.
Open both clamping drive levers (down position) at
the same time to engage the autoclamp drive. When
the clamp pressure equalizes with the system pressure,
the clamp is fully engaged against the pipe.
Figure 5-38. Put both clamping levers down at the
same time to engage the clamping drive.
Summary of Contents for Goliath Guillotine
Page 2: ...Goliath Guillotine Pipe Saw Part No 06 150 520 MAN Rev 0 0607 E H Wachs Company...
Page 8: ...Goliath Guillotine Pipe Saw 4 Part No 06 150 520 MAN Rev 0 0607 E H Wachs Company...
Page 20: ...Goliath Guillotine Pipe Saw 16 Part No 06 150 520 MAN Rev 0 0607 E H Wachs Company...
Page 22: ...Goliath Guillotine Pipe Saw 18 Part No 06 150 520 MAN Rev 0 0607 E H Wachs Company...
Page 58: ...Goliath Guillotine Pipe Saw 54 Part No 06 150 520 MAN Rev 0 0607 E H Wachs Company...
Page 64: ...Goliath Guillotine Pipe Saw 60 Part No 06 150 520 MAN Rev 0 0607 E H Wachs Company...
Page 74: ...Goliath Guillotine Pipe Saw 70 Part No 06 150 520 MAN Rev 0 0607 E H Wachs Company...
Page 76: ...Goliath Guillotine Pipe Saw 72 Part No 06 150 520 MAN Rev 0 0607 E H Wachs Company...
Page 77: ......
Page 78: ...E H Wachs Company 600 Knightsbridge Parkway Lincolnshire IL 60069 847 537 8800 www wachsco com...