2
1
3
9
8
7
5
6
4
1.
Hanger Ball/
Mounting Bracket
2. Downrod
3. Canopy
4. Canopy Screw Cover
5. Coupling Cover
6. Collar
7.
Clevis Pin
8. Hairpin Clip
9. Screws
(painted side face down), and canopy (opened side up) onto
the downrod. Coupling cover goes all the way to the bottom.
6. Carefully reinstall the hanger ball onto the downrod, being
sure that the cross pin is in the correct position, the setscrew
is tightened and wires are not twisted. A loose set screw could
create fan wobble.
7. Carefully lift the fan motor assembly up to the mounting
bracket and seat the hanger ball in the mounting bracket
socket. Make sure the tab on the mounting bracket socket is
properly seated in the groove in the hanger ball. Rotate the
socket assembly until the ball drops and locks into
the hanger bracket screw. You may
choose to
cut off excess
lead wire approximately 6-9 inches above the top of the
downrod. Strip wire insulation off 1/2 inch from the end of
each lead wire
to make your electrical connections
.
10
13
F-081L/ F-083L
8
HANGING THE FAN
07