31
2. whether the drilling and milling machine shows signs of transport damage or if there
are grounds for complaint. In this case we request your immediate notification. Claims
made at a later date cannot be acknowledged.
The lathes must be installed on an appropriate, level and firm base.
This would be, for example:
a base cabinet such as in our accessories programme
own work bench as long as it is strong enough to carry the weight of the machine without warp-
ing (see technical data and check with spirit level) and has an even surface.
a steel plate
The lathe must be firmly screwed down onto the base. To facilitate this, there are 9 mm holes in the
machine base. Good results and a minimum of vibration during operation can only be guaranteed if
the above mentioned requirements for secure mounting have been kept to.
The installation of the machine should take place where there is sufficient lighting, electrical cables
with earthed sockets and O-conductors are installed adequately near to the machine so that the
mains connection lead is not subject to any tension whatsoever. The mains lead should be such
that, by means of a multiple socket, a coolant or lubrication unit can also be connected.
5.
Conditions for best working results