background image

 

 

 

INSTALLATION MANUAL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WAAREE ENERGIES LIMITED

 

 

Head Office:

 

602, Western Edge-I, 
Off. Western Express Highway, 
Borivali (E), Mumbai 400066, 
Maharashtra, India 
Tel: +91-22-66444400 

[email protected]

 

 

Factory Address:

 

Plot No. 231 – 236, 
Surat Special Economic Zone, 
Diamond Park, Sachin, 
Surat- 394230, Gujarat 

Tel: +91-261-2398661 

Summary of Contents for PV Modules

Page 1: ...fice 602 Western Edge I Off Western Express Highway Borivali E Mumbai 400066 Maharashtra India Tel 91 22 66444400 waaree waaree com Factory Address Plot No 231 236 Surat Special Economic Zone Diamond...

Page 2: ...CAUTIONS FOR UNPACKING HANDLING STORAGE OF PV MODULE 5 CLIMATIC CONDITIONS 6 NOTES ON INSTALLATION 6 SPECIFICATIONS 7 SOLAR PV MODULE MOUNTING GUIDELINES 7 GROUNDING 10 ELECTRIC WIRING 11 CABLE PROTEC...

Page 3: ...ed on our knowledge and experience and is believed to be reliable but such information including product specifications without limitations and suggestions do not constitute a warranty expressed or im...

Page 4: ...d by qualified personnel only Children and unauthorized persons should not be allowed near the installation of PV Modules Use Module for its intended function only Be sure that all other system compon...

Page 5: ...e Modules Avoid Module mishandling during unloading Do not stack more than the maximum amount of allowable pallets on top of each other At the installation site take care to keep Modules and particula...

Page 6: ...o the Module output NOTES ON INSTALLATION Please read this guide completely before installation or use of the Modules Modules shall be mounted with the orientation and tilt angle required for consiste...

Page 7: ...dule frames Since sparks may occur do not install the Module where flammable gases or vapors are present During installation all local and national electrical and building codes and regulations shall...

Page 8: ...Aluminium Frame 2 M6 Stainless bolts 3 Flat Stainless washer 4 Spring Stainless washer 5 HEX Stainless Nut b Mounting guidelines for Clamping of Modules Each Module must be securely fixed to the mount...

Page 9: ...fety it is better to follow the clamp manufacturer s recommendations Clamp types Mid clamps They hold each neighbouring panel on the purlin End clamps They hold the panel at fringes at their position...

Page 10: ...racks must be properly grounded in accordance with respective national electrical code The earth grounding connection shall be done by a qualified electrician The longer sides of the Module frames are...

Page 11: ...n accordance with applicable electrical codes All wiring should be done by a qualified licensed professional Wiring should be protected to help ensure personal safety and to prevent its damage Modules...

Page 12: ...e with appropriate precautions e g locate them within plastic conduit Avoid exposure to the direct sunlight Ensure that the cables will be away from areas where water can form puddles When disconnecti...

Page 13: ...the frame do not treat back sheet and front surface of the Module with paint and adhesives Do not artificially concentrate light on the Module GENERAL SAFETY Follow all permission installation and in...

Page 14: ...late on the surface of the Module This can reduce the optimal output performance of the solar Modules Normally the accumulated dust can be washed with water but in some instances some maintenance is r...

Page 15: ...irt which is not easily removed by dry cleaning Do not clean or spray water at the Junction Box or any area on the backside of the Module Frequency of Cleaning will vary depending upon any special con...

Reviews: