VWR
18L personal incubator 6-1
6
Operation
Preparing the device
The device must not be released for operation before all major start-up activities have been completed
(see chapter
).
Device Check
Prior to starting operation, the following device components must be checked for their correct
function:
• The door seal in the front frame must not be damaged.
• The perforated plates have to have been correctly inserted.
Starting Operation
1. Switch the device on with button
.
2. The display shows the current useable space temperature.
3. Set the target values for the temperature using buttons
and
on the control panel.
4. Wait until the device has reached the set temperature. The temperature control regulates the
temperature at the set target temperature value.
5. Load the useable space.
Proper loading
To ensure sufficient air circulation and uniform heating of the sam-
ples, do not use more than 70% of the maximum surface area of the
useable space. Bulky objects in the useable space that dissipate
heat may impair heat distribution.
Summary of Contents for 89511-416
Page 1: ......
Page 10: ...Delivery of the device Scope of supply 2 2 18L personal incubator VWR ...
Page 16: ...Description of unit Condensation tray 4 4 18L personal incubator VWR ...
Page 20: ...Operation Starting Operation 6 2 18L personal incubator VWR ...
Page 24: ...Shut down Shutting the device down 8 2 18L personal incubator VWR ...
Page 30: ...Maintenance Inspections and checks 10 2 18L personal incubator VWR ...
Page 36: ...Accessories 13 2 18L personal incubator VWR ...
Page 37: ......
Page 38: ......