4-2
Refrigerated Incubator
VWR Collection
Section 4
Unpacking and Installation
Leg Leveler
Installation
Use the adjustable feet to level the incubator.
1. Tip unit backwards so there is one foot of clearance on front of the
unit. Have someone assist in tilting the unit, to prevent the incubator
from falling while installing the leg levelers.
2. Screw front two leg levelers in until snug.
3. Tip the unit forward to screw in the back two leg levelers. Have
someone assist in tilting the unit, to prevent the incubator from falling
while installing the leg levelers. Leg leveler installation is complete.
4. If floor conditions do not allow the unit to sit level, adjust leg leveler(s)
by turning the required leveler counterclockwise to increase the height
and clockwise to reduce the height.
The Refrigerated Incubator should be installed on a level, stable floor.
Caution
Do not place unit on its top, side, back, or front. If unit is
accidentally placed in any position other than right side up, the unit must
remain in upright position for at least 24 hours before connecting to
power.
s
Locate the unit so that area in front of door and kick grille is clear. To
prevent heat build up within the unit, do not install it where it will be
exposed to strong sunlight, nor near radiators, furnaces, or other sources of
heat. Do not install the incubator where flammable or corrosive
atmospheres may exist. The Refrigerated Incubator is not to be used out-
of-doors or where excessive moisture or contamination could cause
degrading of mechanical or electrical components.
Installation
Figure 4-1.
Leg Levelers