Fig. 25
5.
Remove pilot orifice fitting from burner.
6.
Tilt pilot orifice fitting to remove the orifice.
7.
Reverse procedure to install.
NOTE:
When installing, verify orifice size is correct
for gas type and is free from debris. Clean the orifice
with air or water only.
8.
Check for proper operation.
GRIDDLE PLATE ASSEMBLY
Disconnect the
electrical power to the machine and
follow lockout / tagout procedures.
Shut off the gas before servicing the
unit.
All gas joints disturbed during
servicing must be checked for leaks. Check with a
soap and water solution (bubbles). Do not use an open
flame.
For larger units, removal and replacement
of the griddle plate weld assembly should be done by
more than one service technician .
1.
2.
3.
Remove THERMOCOUPLE (INFRARED
BURNER) or THERMOCOUPLE (RADIANT
BURNER) from griddle plate. Leave
thermocouple wires connected at temperature
controller.
4.
Remove screws (2) securing griddle plate to
frame at the front of griddle.
5.
Cut two lengths of 2x4 appropriate for the griddle
plate width, leaving additional length to grasp on
each side of griddle plate.
6.
Lift front of griddle plate and support with 2x4
then lift rear of griddle plate and support with 2x4.
Fig. 26
7.
Lift griddle plate and remove from base of
equipment.
8.
Reverse procedure for installation.
VCCG Series Heavy Duty Gas Griddle - REMOVAL AND REPLACEMENT OF PARTS
Page 13 of 26
F45533 (1014)