background image

VULCAN-HART 

 

3600 NORTH POINT BLVD. 

DIVISION OF ITW FOOD EQUIPMENT GROUP, LLC 

BALTIMORE, MD 21222 

www.vulcanequipment.com

 

Vulcan ©2016 All Rights Reserved

 

F-41190  (02-16) 

 

 

 
 

INSTALLATION & 

OPERATION MANUAL 

 

V SERIES FOOD HEATED HOLDING 
PROOFER CABINET 
 

MODEL: 
 

VP18 ML-138089 

    

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

For additional information on Vulcan-Hart or to locate an authorized parts 

and service provider in your area, visit our website at 

www.vulcanequipment.com

 

 

Summary of Contents for ML-138089

Page 1: ...ipment com Vulcan 2016 All Rights Reserved F 41190 02 16 INSTALLATION OPERATION MANUAL V SERIES FOOD HEATED HOLDING PROOFER CABINET MODEL VP18 ML 138089 For additional information on Vulcan Hart or to...

Page 2: ...ED BY THIS MANUAL FOR YOUR SAFETY DO NOT STORE OR USE GASOLINE OR OTHER FLAMMABLE VAPORS OR LIQUIDS IN THE VICINITYOF THIS OR ANY OTHER APPLIANCE Improper installation adjustment alteration service or...

Page 3: ...CTION 3 INSTALLATION 3 4 ELECTRICAL REQUIREMENTS 5 OPERATION 6 CONTROLS 6 PROOFING OPERATING INSTRUCTIONS 7 DOUGH PREPARATION 8 PROOFING SHUTDOWN 8 HOLDING OPERATING INSTRUCTIONS 9 HOLDING SHUTDOWN 9...

Page 4: ...t proceed with unpacking and installation Contact your Vulcan Hart Customer Service Department immediately UNPACKING The Cabinet was inspected before leaving the factory The transportation company ass...

Page 5: ...terior of the unit Never use harsh chemicals or abrasive pads to clean the unit See cleaning instructions in this manual LOCATION For efficient cabinet operation choose a location that will provide ea...

Page 6: ...single phase operation All 110 120 volt cabinets are equipped with a 8 foot cord and NEMA 5 20 plug as standard equipment All 208 240 volt cabinets are equipped with an 8 foot cord and NEMA 6 15 plug...

Page 7: ...supplied to the cabinet and the cabinet is in Proofing Mode Thermostat The Thermostat turns power on to the heating elements If Proofing mode is desired the thermostat should be set in the red Proof...

Page 8: ...temperature and humidity The Cabinet and its parts are hot Be very careful when operating cleaning or servicing the cabinet At the proper setting your proofer door will have a light haze of moisture o...

Page 9: ...m refrigerator and allow the dough to reach room temperature Hint You may want to place the dough on a greased room temperature pan This helps shorten the proofing time Placing cold pans in the proofe...

Page 10: ...to preheat 5 Load Hot food pans with hot cooked food into cabinet 6 When removing items start at the bottom and work up This will keep food hotter and eliminate spillage onto lower items This cabinet...

Page 11: ...t damage LOCKOUT TAGOUT PROCEDURE Always perform the Lockout Tagout Procedure before removing any sheet metal panels or attempting to service this equipment The Lockout Tagout Procedure is used to pro...

Page 12: ...s not heat properly Door not shut properly or needs adjustment Check door seal and Contact Authorized Service Provider Defective element thermometer thermostat thermostat requires adjustment Contact A...

Page 13: ......

Page 14: ......

Page 15: ......

Page 16: ......

Page 17: ......

Page 18: ......

Page 19: ......

Page 20: ......

Page 21: ......

Page 22: ......

Page 23: ......

Page 24: ......

Reviews: