background image

 

 

Fig. 

    Fig. 

    Fig. 

  1.  Remove existing rear shelf and install the reinforced high shelf. 

  2.  Install mounting brackets on both top corners of reinforced shelf, using the four bolts 

provided. 

  3.  Place and align Cheesemelter on top of brackets; place the back of the unit flush 

with the rear of the shelf.  

  4.  Using a #19 drill bit, drill from below through the four holes provided on the mounting 

bracket into the base of the unit. 

  5.  Drive four #10-24 self-tapping screws (provided) into the drilled holes. 

  6.  Attach both Cheesemelter and high shelf to the common rear panel with self-tapping 

screws. 

GAS CONNECTIONS 

CAUTION:  Gas supply connections and any pipe joint compound must be resistant 
to the action of propane gases.

 

Location of the gas inlet is at the top right rear corner of the top panel. Codes require that 
a gas shutoff valve must be installed in the gas line ahead of the Cheesemelter. 

Connect gas supply (1/2“pipe minimum recommended size). Make sure the pipes are 
clean and free of obstructions. 

NATURAL GAS: Standard orifices are set at 6" W.C.  A pressure regulator is supplied and 
must be installed when appliance is connected to gas supply. 

PROPANE GAS:  Standard orifices are set at 10" W.C.  A pressure regulator is supplied 
and must be installed when cheesemelter is connected to gas supply.  

Maximum line pressure for natural and propane gas is 14" W.C.  Minimum line pressure is 
7" W.C. for natural gas and 11" W.C. for propane gas.  

 

 

- 5 - 

Summary of Contents for CMJ24 ML-135124

Page 1: ...VCM48 ML 135127 VCM60 ML 135128 VCM72 ML 135129 www vulcanhart com MODELS MLS CMJ24 ML 135124 CMJ34 ML 135123 CMJ36 ML 135126 CMJ48 ML 135127 CMJ60 ML 135128 CMJ72 ML 135129 www wolfrange com ITW Food...

Page 2: ...TANT IN THE EVENT A GAS ODOR IS DETECTED SHUT DOWN UNITS AT MAIN SHUTOFF VALVE AND CONTACT THE LOCAL GAS COMPANY OR GAS SUPPLIER FOR SERVICE FOR YOUR SAFETY DO NOT STORE OR USE GASOLINE OR OTHER FLAMM...

Page 3: ...located underneath the grease drip pan If the supply and equipment requirements do not agree do not proceed with the installation Contact your dealer immediately UNPACKING Immediately after unpacking...

Page 4: ...ards Committee Z223 400 N Capital St NW Washington DC 20001 or the Secretary Standards Council NFPA 1 Batterymarch Park Quincy MA 02169 7471 3 NFPA Standard 96 Vapor Removal from Cooking Equipment lat...

Page 5: ...supply connections and any pipe joint compound must be resistant to the action of propane gases Location of the gas inlet is at the top right rear corner of the top panel Codes require that a gas shut...

Page 6: ...ig 3 45 kPa or 14 W C TESTING THE GAS SUPPLY SYSTEM When gas supply pressure exceeds psig 3 45 kPa the Cheesemelter and its individual shutoff valve must be disconnected from the gas supply piping sys...

Page 7: ...TIONS 1 Turn gas shutoff valve and burner valve to the OFF position and wait 5 minutes 2 Turn gas shutoff valve ON Light the pilot adjacent to the main burner Adjust the pilot valve screw until the pi...

Page 8: ...ild soap and water applied with a damp cloth Rinse the surface with clean water and dry with a soft clean cloth Do not use abrasive cleaners or strong liquid cleaners on stainless steel surfaces as th...

Page 9: ...side 1 Cheesemelter not level side to side 2 Cheesemelter burner improperly installed Uneven heat front to back Cheesemelter not level front to back Dried out products 1 Melting time too long or produ...

Reviews: