4. OPERATION AND MAINTENANCE  

Start-up of the pump 

Do not start the pump until the system has been filled with liquid and vented. Being self-venting, the rotor 
can does not require venting before start-up. Air inside the pump will be transported by the medium into 
the system during the first minutes after pump start-up. 
The system cannot be vented through the pump. As the pump is self-venting, it does not need to be vented 
before start-up. However, besides the smallest pump 25-70, it is recommended to vent pumps installed in 
systems where the pumped medium is very dirty, as well as after service of the pump. The screw may be 
loosened to check if the system has been vented completely. 

 
When loosening the air-venting/de-blocking screw, be aware of hot, spraying water

 
The operation of the pump depend on the type used in the water pump group (Table.3). 

UPM3 25-70 Flex AS - 

The user interface is designed with a single push button, one red/green LED and four yellow LEDs.

 

 

The user interface shows: 

• performance view (during operation)

 

 operation status  

 alarm status 

• settings view (after pressing the button).

 

During operation, the display shows the performance view. If you press the button, the user interface switches the view or runs in 
the setting selection mode. The performance view shows either the operation status or the alarm status. 
When the circulator is running, LED 1 is green. The four yellow LEDs indicate the current performance as the percentage of P Max. 
(0- one LED green, 0-25% - one LED green + one yellow, 25-50 

 one LED green + two yellow LED, and adequately for 50-75, 75-100. 

When the operation mode is active, all active LEDs are constantly on in order to differentiate this mode from the select setting 
mode. If the circulator is stopped by an external signal, LED 1 flashes green. 

Alarm status 

If the circulator has detected one or more alarms, the bi-colored LED 1 switches from green to red. When an alarm is active, the 
LEDs indicate the alarm type as defined in the table below. If multiple alarms are active at the same time, the LEDs only show the 
error with the highest priority. The priority is defined by the sequence of the table. 
When there is no active alarm anymore, the user interface switches back to operation mode. 

 

Display 

Indication 

Pump operation 

Counter action 

One red LED + one 

yellow LED (LED 5) 

Rotor is 

blocked. 

Trying to start 

again every 1.33 

seconds. 

Wait or deblock 

the shaft. 

One red LED + 

one yellow LED 

(LED 4) 

Supply 

voltage too 

low. 

Only warning, 

pump runs. 

Control the 

supply voltage. 

One red LED + 

one yellow LED 

(LED 3) 

Electrical 

error. 

Pump is stopped 

because of low 

supply voltage or 

serious failure. 

Control the 

supply voltage / 

Exchange the 

pump. 

 

Push button                  LEDs 

Summary of Contents for WPG-25-070-10

Page 1: ...Water pump group Technical documentation WPG v 1 0 03 2016...

Page 2: ...uirements recommendations 2 1 2 Transport and storage 2 2 APPLICATION AND DESIGN 2 2 1 Technical parameters 4 2 2 Pump groups characteristic 5 3 INSTALLATION 6 3 1 Hydraulic installation 6 3 2 Electri...

Page 3: ...he instruction as well as changes to the device that affect its operation without prior notice VTS shall be are no responsibility for on going maintenance and damage caused by standstills of equipment...

Page 4: ...alve actuator M1 fan motor M2 pump motor 1 casing 2 thermomanometer 3 circulation pump 4 filter 5 3 way valve with actuator Fig 1 Operation diagram All is closed in the thermal casing made of EPP Ther...

Page 5: ...ge P max W Max current A Max water temp C Ambient temp C Max work Pressure bar Overload protection IP kvs Max water temp C IP Voltage WPG 25 070 2 5 5 4 1 x 230V 50Hz 52 0 52 110 0 40 10 integrated 44...

Page 6: ...uid temperature the viscosity will increase with water as medium This will influence the pressure loss of the system as well as the efficiency performance and load of the pump Fig 3 Characteristics of...

Page 7: ...be supported in some place to avoid the pass of weight and thermal stresses onto the exchanger s connections Ends of the groups are ended with an internal thread To provide the seal connection should...

Page 8: ...he electrical supply is suitably isolated Do not attempt to supply electricity to the pump without ensuring that all electrical fittings cables and enclosures are intact and suitably electrically isol...

Page 9: ...ual delivered with valve actuator Both of them can be connected to VTS control system in case of ordering VTS AHU with full automation Notes 11 Connect via safety isolation transformer 12 Direction of...

Page 10: ...selection mode The performance view shows either the operation status or the alarm status When the circulator is running LED 1 is green The four yellow LEDs indicate the current performance as the pe...

Page 11: ...setting mode area If you press the key lock for more than 10 seconds you can toggle between enabling disabling the key lock function When doing so all LEDs except for the red LED will flash for a sec...

Page 12: ...let pressure is too low Increase the system pressure or check the air volume in the expansion tank if installed Insufficient flow Pump performance is too low Hydraulic system is closed or system press...

Page 13: ...arancyjna unta mezgls Elektroinstal cija un garantijas karte Veepumbagrupp Elektripaigaldis ja garantiikaart Szivatty egys g Elektromos telep t s s garancialap Sm ovac uzel Elektrick zapojen a z ru n...

Page 14: ......

Page 15: ...GWARANCYJNA 10 SATURS 1 ELEKTROINSTAL CIJA 4 2 GARANTIJAS KARTE 11 SISUKORD 1 ELEKTRIPAIGALDIS 5 2 GARANTIIKAART 12 TARTALOMJEGYZ K 1 ELEKTROMOS TELEP T S 6 2 GARANCIAPAP R 13 OBSAH 1 ELECTRICK ZAPOJ...

Page 16: ...xample phase cut or pulse cascade control The supplied pumps are delivered with molex 3 pin plug and cable to moved out of the pump group casing Connect power supply to the three leads L N and PE Line...

Page 17: ...cie faz lub pulsacyjno kaskadowym Stosowane pompy s dostarczane z 3 pinow z czk i kablem dla wyprowadzenia poza obudow zespo u Zasilanie pod czy do trzech przewod w l N i PE Faza L br zowy Neutralny N...

Page 18: ...ieg d to s k u komplekt cij ir Molex 3 tapi u spraudnis un no s k a grupas korpusa izvad ts kabelis Energoapg de j savieno ar tr s vadiem L N un PE L nija f ze L br ns Neitr le N zils Aizsargzem jums...

Page 19: ...s releel liti v i impulss kaskaadregulaatoriga Pumbad tarnitakse koos kolme kontaktiga Molex pistiku ja kaabliga mis juhitakse pumbagrupi korpusest v lja hendage toite kaabel kolme juhtmega L N ja PE...

Page 20: ...atja a t pfesz lts get pl f zis v g s f zis v ltoztat szab lyz s A szivatty k bek tve 3 pines molex csatlakoz val ker lnek sz ll t sra mely m r kivezet sre ker lt az egys gen k v lre A k beleket a jel...

Page 21: ...xtern regulac ot ek kter m n p vodn nap jen Nap klad pulzn kask da erpadlo je dodan s 3 pinov m konektorem molex T lov L N a PE Line f ze L hn d Neutr l N modr Zem lut zelen K p ipojen pou ijte t lov...

Page 22: ...mo phase cut ar pulso kaskado pulse cascade metodu Siurbliai pristatomi su molex 3 pin maitinimo adapteriu ir elektros kabeliu i vestu i siurblio vado gaubto tampos tiekim prijunkite prie trij laid pa...

Page 23: ...ed by standstills of equipment while waiting for warranty services 3 All damage pertaining to Buyer s property other than the equipment in question Complaints 1 Complaints are to be reported to VTS vi...

Page 24: ...urz dzenia maj tku Klienta Reklamacje 1 Reklamacj nale y zg asza do VTS Polska poprzez e mail lub fax 2 Reklamacj nale y zg asza na formularzu Protok Zg oszenia Reklamacyjnego kt ry dost pny jest on...

Page 25: ...rantijas pakalpojumu snieg anu 3 Visiem boj jumiem saist b ar Klienta pa umu iz emot attiec go apr kojumu S dz bas 1 Par s dz b m j pazi o uz mumam VTS pa e pastu vai faksu 2 S dz bas iesniedzamas lie...

Page 26: ...oleva Seadme seisakust p hjustatud kahjustuste eest 3 Kliendi muu omandi kui k nealuse Seadme kahjustuste eest Reklamatsioonid 1 Reklamatsioonid tuleb VTS ile esitada kas e posti v i faksi teel 2 Rekl...

Page 27: ...rbantart s rt szemrev telez s rt s programoz s rt 2 A garanci lis jav t sra v r s k zbeni illet ktelen beavatkoz sok rt 3 A megrendel tulajdon ba l v egy b s r lt berendez s rt Hibabejelent s 1 A hiba...

Page 28: ...za zen 2 kody zp soben prostojem za zen v dob ek n na poskytnut z ru n slu by 3 Ve ker kody na jin m za zen ne je majetek Klienta Reklamace 1 Reklamaci je nutn ozn mit VTS pomoc e mailu nebo faxu 2 Re...

Page 29: ...ako u 1 Einam j konservavim kontrol taip pat renginio programavim 2 al patirt d l renginio prastovos per garantini paslaug laukimo laikotarp 3 al kitam Kliento turtui i skyrus rengin Reklamacija 1 Rek...

Page 30: ...16...

Page 31: ...17...

Page 32: ...ar sken jot zem k izvietoto QR kodu Kogu tehnilist dokumentatsiooni leiate www vtsgroup ee kaudu gruppides Tooted Dokumendikeskus v i sk nnides all olevat QR koodi A teljes technikai dokument ci t me...

Reviews: