background image

35

 

 

 

164

 

145

 

 

 

5. AUTOMATICS 

 

5.1  ELEMENTS OF AUTOMATICS

 

Electric connections may only be made by well-trained electricians, and according to: 

Occupational health and safety regulations

 

Assembly instructions

 

Technical documentation for each of the automatic elements

 

NOTE 

Before starting the assembly process and connecting the system, familiarize yourself with the original documentation attached to the automatic devices.

 

 

MODEL

 

SCHEMAT

 

DANE TECHNICZNE

 

UWAGI

 

 

AR

W

 3

,0

/2

*

 

(V

o

lc

a

n

o

 V

R M

in

i,

 V

R1,

 

V

R2,

 V

R3,

 V

R

-D)

 

V

T

S

: 1

-4

-0

1

0

1

-0434

 

 
 
 

 

90 

91

 

 

SPEED CONTROLLER 

– ARW 3,0/2

 

● Power supply voltage: 230V AC +/- 10%

 

● Allowable current output: 3 A

 

● Control mode: step control

 

● Number of control levels: 5

 

● Type of protection: IP54

 

● Assembly methods: On a wall

 

● Work environment parameters 0…35°C

 

 

●  Do not connect more than one VOLCANO VR 1/VR 2/VR 3/VR-D 

device to one rotation controller and more than four

 

VOLCANO VR Mini devices due to the values of permissible 
output currents.

 

● Minimal distance between particular fans installed – both vertical 

and horizontal 

– 20 cm.

 

● We recommend the execution of power supply connection with a 

min. 3 x 1.5mm

wire

 

● Automation element drawings present the visualizations of model 

products only..

 

 

 

AR

W

 0

.6

 

V

T

S

: 1

-4

-0

1

0

1

-0167

 

 

 

 

SPEED CONTROLLER - ARW 0.6

 

● Power supply voltage: 230V AV +/-10%

 

● Allowable current output: 0,6A

 

● Control mode: manual

 

● Number of control levels: 3

 

● Work environment parameters: 35°C

 

● Type of protection: IP54

 

 

●  Do not connect more than one VOLCANO VR Mini device to 

one controller

 

●  Minimal distance between particular fans installed

 

– both vertical and horizontal – 20cm.

 

●  We recommend the execution of power supply connection 

with a min. 3 x 1.5mm

wire.

 

●  Automation element drawings present the visualizations 

of model products only.

 

 

T

W

O

-W

AY

 V

AL

V

E

 

W

IT

H V

R AC

T

UA

T

OR V

R

 

V

T

S

: 1

-2

-1

2

0

4

-2019

 

 

 

TWO-WAY VALVE

 

●  Connection diameter: 3/4”

 

●  Operation mode: on/off

 

●  Maximum differential pressure 90 kPa

 

●  Airflow degree factor kvs: 4.5 m

3

/h

 

●  Work environment paramet ers: 0-60°C

 

 

VALVE ACTUATOR

 

●  Power consumption1 W

 

●  Power supply voltage: 230 V AC +/- 10%

 

●  Closing/opening time 3/3 min

 

●  Item without supply: closed

 

●  Type of protection: IP54

 

●  Work environment parameters: 0-60°

 

●  Two-way valve should be installed on the return (outlet) pipeline.

 

●  Automation element drawings are only a visualisation of sample 

products.

 

 
 
 
 

 

●  Power connection should be done with a cable min. 2 x 0.75 mm

2

.

 

●  Automation element drawings are only a visualisation of sample 

products.

 

 

Co

n

tr

o

ll

e

HM

V

OL

CA

NO

 EC

 

V

T

S

1

-4

-2801

-0

1

5

7

 

 

 

 

HMI VOLCANO EC

 

●  Device operation: Touch buttons

 

●  Power supply: 230 V AC

 

●  Maximum output current for valve or valves with actuator: 

3(1)A

 

●  Temperature measurement: -10 °C ... +99 °C ; NTC10K

 

●  Outputs:

 

- 1 analog output 0-10V (8 bit, Imax = 20 mA)

 

- 2 relays outputs (250 VAC, AC1 500 VA dla 230 VAC)

 

●  Communication: Modbus RTU

 

●  Parameters of working environment: temperature: 

0 - 

60 °C, humidity: 10 - 90%, without condensation

 

●  Display: blue backlight

 

●  Dimensions: 86 mm x 86 mm x 17 mm

 

●  Protection level: IP20

 

●  used for control all types of VOLCANO EC units

 

●  touch control panel

 

●  the main on / off switch (ON / OFF)

 

●  stepless adjustable fan speed of the EC motor

 

●  built-in thermostat with possibility weekly programing

 

●  continuous mode

 

●  function of heating, cooling and ventilation

 

●  possibility of using external temperature sensor

 

●  RS 485 with ModbusRTU

 

●  Suggested cross sections of electrical cables:

 

- L, N : 2x1 

mm²

 

- H, C : 2x1 

mm²

 

AO, GND : 2x0,5 mm² LIYCY

 

TS; TS : 2x0,5 mm² LIYCY

 

RS 485 : 2x0,75 mm² LIYCY

 

EN

 

Summary of Contents for VOLCANO VR Mini

Page 1: ...Technicaldocumentation Check us on VOLCANOVR Mini VOLCANOVR Mini 3 VOLCANO VR1 VOLCANO VR2 VOLCANO VR3 VOLCANO VR4 VOLCANO VR D Mini VOLCANOVR D VR ver 5 0 06 2022 EN...

Page 2: ...iple of operation 2 3 Construction of the device 2 4 Overall dimensions 3 TECHNICAL DATA 4 INSTALLATION 4 1 Installation with a bracket 4 2 Installation instructions 5 AUTOMATIC DEVICES 5 1 Automatic...

Page 3: ...ntenance work it is required to disconnect power supply and protect it against unintentional activation 2 STRUCTURE INTENDED USE PRINCIPLE OF OPERATION 2 1 INTENDED USE VOLCANO VR has been designed to...

Page 4: ...f the device High engine power allows for achieving high efficiency at low power consumption rates maintaining full air feed regulation Properly profiled housing lowers the noise emission levels which...

Page 5: ...0 12 0 4 1100 10 6 48 6 0 47 4 8 6 43 4 0 38 2 8 6 6 38 0 29 1 8 1 9 25 2 0 08 0 2 Tz inlet water temperature Tp outlet water temperature Tp1 inlet air temperature Tp2 outlet air temperature Pg heatin...

Page 6: ...34 5 0 84 11 1 15 4 31 8 0 68 7 6 11 8 29 0 52 4 8 4 2 23 2 0 18 0 8 2800 15 8 36 8 0 7 7 9 12 9 33 7 0 57 5 5 9 9 30 5 0 43 3 5 3 5 23 7 0 15 0 6 Tz inlet water temperature Tp outlet water temperatu...

Page 7: ...3 70 20 5300 60 6 53 8 2 70 84 5 39 6 42 1 1 70 47 3 19 5 30 9 1 70 49 70 9 4 24 7 0 70 11 70 3950 49 6 57 1 2 20 66 2 32 5 44 3 1 40 33 3 16 0 32 0 1 40 35 00 7 7 25 1 0 60 8 40 2850 39 3 60 7 1 70 4...

Page 8: ...TABLE Parameter Unit of measure VOLCANO VOLCANO VOLCANO VOLCANO VOLCANO VOLCANO VOLCANO VOLCANO VR Mini VR Mini 3 VR1 VR2 VR3 VR4 VR D Mini VR D Number of rows in the heater 2 3 1 2 3 4 Maximum air fl...

Page 9: ...air stream range m 12 9 7 11 8 6 Volcano VR 3 Volcano VR 4 fan speed III II I III II I air ow m h 5700 4100 3000 5300 3950 2850 noise level for Volcano AC dB A 57 51 45 56 51 41 noise level for Volcan...

Page 10: ...ng observe the following factors mounting height for vertical air guides adjustment distance between units recommended distance 6 12m Volcano VR1 VR2 VR3 3 7m Volcano VR Mini in order to ensure even h...

Page 11: ...u adjust the device in the right position fit plugs onto the bracket The bracket unit consists of 1 ARM 1 piece 2 HOLDER 3 M10 SCREW WITH A WASHER AND NUT FASTENING THE CLAMP 2 sets 4 M10 SCREW FASTEN...

Page 12: ...N O V R M I N I V R M i V R Marks L mm A 247 B 517 C 308 D 610 NOTE In case of VOLCANO VR Mini 3 and VOLCANO VR4 heaters we recommend to connect the power supply to the upper connector in order to add...

Page 13: ...ate condensate In this situation a drip tray is recommended to collect and drain the condensate NOTE In order to limit the effect of entrainment of the condensate by the air stream it is recommended t...

Page 14: ...hings VOLCANO VR MINI VR Mini 3 VR1 VR2 VR3 VR4 VR D MINI VR D EC NEW Power supply 3 x 1 5mm2 Control 0 10 V DC LiYCY 2 x 0 75 mm2 shielded Additional output 10 V DC Example of the nameplate unit s eq...

Page 15: ...of power supplyconnection with a min 3 x 1 5mm2 wire Automation element drawings present the visualizations of model products only TWO WAY VALVE WITH VR ACTUATOR VR VTS 1 2 1204 2019 TWO WAY VALVE Con...

Page 16: ...automatic devices power supply fan It is suggested to use additional external current differential protection NOTE All connections should be made according to this technical documentation and the docu...

Page 17: ...nnection 3 Make sure that the equipment is at zero voltage 4 Cover or isolate nearby components that are still live To energize the system apply the measures in reverse order Components The machines c...

Page 18: ...sposal organization in your vicinity Clarify what is expected in terms of the quality of dismantling the machine and provision of the components Dismantle the machine using the general procedures comm...

Page 19: ...s on the motor and ARW made correctly Electrical connection need to be done strictly according to the drawings in the manual If there is no bridge between U1 and TK TB clamps the motor lacks thermal p...

Page 20: ...the complaint notification refers to the following equipment VR Mini VR1 VR2 VR3 VR D VTS POLSKA Sp z o o Al Grunwaldzka 472 A 80 309 Gda sk Polska EN www vtsgroup com The company submitting the notif...

Page 21: ...41...

Reviews: