
Single belt press EBP580
Version: 166000000, M0017267B_EN208-240-60D
Date: 28.11.2017
- 41 / 52 -
10
Servicing and Repairs
10.1 General
The mechanical and electrical equipment requires regular servicing if it is to fulfill its tasks satisfactorily
at all times.
The general safety notes the documentation/Operating Manual must be adhered to without fail.
The component-specific notes listed below must be observed!
Before taking the machine/line apart into its components the Operating Manual including all drawings,
must be carefully studied!
The machine/line is constructed so as to require very little servicing. The servicing work required is
concentrated on the few activities listed in the Operating Manual at the intervals as given.
The machine/line is to be checked regularly in compliance with operational experience. Parts that are
recognisably damaged are to be replaced at an early date to avoid subsequent damage and downtime.
BEFORE OPENING UNPLUG!
Interrupting your work on the machine power supply and secure against accidental before
reconnecting it and turning.
Non compliance can mean severe personal injury.
WARNING AGAINST GENERAL DANGERS
can put persons at risk, Reduce the efficiency of or damage the machine/line or of
the machine/line parts.
Before assembly or dis-assembly is begun on the machine/line, the safety
instructions that are described in the chapter "Safety requirements for the operating
state" must be followed without fail.
WARNING AGAINST GENERAL DANGERS
Before starting work on parts of the electrical system measures must be taken to
ensure that it is not live. the order of the safety rules is as follows:
1.) clearing by interrupting the electrical circuit
2.) secure against switching on by unauthorized persons
3.) place appropriate warning notices
4.) ensure that power supply is switched off
5.) effectively isolate any neighboring live parts from the working area
The above mentioned measures are then ended in reverse order, when the
maintenance work is completed.