background image

11

10

2

2

2

2

2

2

2

2

2

2

2

2

Assemble  arcs  4в  in  pairs  using  ridge 

cover plate and strainer 9. Connect end 

elements 5 to arcs 4в using arm.

Connect balks 2 to 

assembled arcs.

2

2

Assembly stages 

Figure 5

Figure 6

4.

Level the frame using filling or deepening of pits to make longitudinal elements 

straight, horizontal and parallel to each other and to make arcs even at side view. 

If  arc  planes  require  leveling,  loosen  connections  of  balks  with  arcs,  complete 

leveling on the ground and tight screws again. Fill frame supports with soil after 

fastening bottom wire bandages on element 3 (Fig. 27).

1.

 Perform the assembly close to location of the greenhouse.

2.

 Assemble greenhouse in accordance with photographs of assembly stages 

and units represented in Fig. 5.12. The figures show assembly of greenhouse 

of  4  m  length.  Required  length  is  reached  using  attachment  of  appropriate 

number of Insert packages. Use M5x10 screws for connection of elements.

3.

 On the site selected for greenhouse installation dig pits at a depth of shovel 

blade according to Fig. 4. Install frame into the pits. Check equality of frame 

diagonals using a cord. Total draft of greenhouse into the ground should be so 

that bottom elements 6 of door opening touch the ground and elements 2 are 

about 5 cm above the ground. Check equality of the diagonals using a cord 

again and correct position of the frame angles.

Assembly sequence

Install end elements 6, 7, 8. When installing the 

greenhouse through digging (without foundation), 

connect elements 1 and 3 to frame. Fasten bottom wire 

bandage in free hole of element 3.

Figure10

2

6

2

1

arm

6

Figure 7

Connect  arcs  4н  to 

arcs 4в from one side 

of greenhouse.

 

Connect balks 2 

to arcs 4н

Figure 9

Connect in the same 

way arcs 4н and balks 

2 from the other side 

of greenhouse.

7

1

3

7

6

6

6

8

8

3

1

А

5

arm

Assembly manual

Assembly manual

А (inside view)

А (outside view)

arm

5

5

9

9

9

А

В

C

B

Figure 8

ridge

cover plate

Б

9

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

bottom wire 

bandage

3

1

А

А

А

C

B

В

Assembling stages

Summary of Contents for DACHNAYA-STRELKA 2011

Page 1: ...1 honeycomb polycarbonate greenhouse Technical certificate Assembly manual page 2 6 page 7 22 height 2 47 m width 2 6 m Quality management system QMS of LLC Volya is certified for compliance with standard of ISO 9001 2008 Certified by Russian Registry ...

Page 2: ...kage sealing profile 85х270х200 1 45 6 package fixtures and component parts 350x300 3 8 Insertion 2 m frame elongation 1 package balks 80х980х65 12 5 2 package elements of arcs and straight elements 135х1480х65 17 5 3 package ridge profile 40х1100х750 1 42 4 package fixtures and component parts 85х200х200 1 1 green house length Package number Insert 2m 4m 6m 8m Length m Covered area m2 Polycarbona...

Page 3: ...0 kg per 1 m2 corresponding to 2 25 m of fresh snow layer or 1 1 m of packed snow layer Recommended 4 mm depth of polycarbonate is enough for Russian midland In case of regions with snow cover exceeding 0 6 m thicker polycarbonate should be used for coverage of greenhouse top in accordance with local conditions Operating rules Cleaning and washing polycarbonate sheets 1 Rinse sheet with warm water...

Page 4: ...nty Assembly manual DACHNAYA STRELKA greenhouse installation manual 1 General view of frame is represented in Figure 1 Install details in such a way to make side shelves facing coverage Assemble frame from numbered elements 2 Legend arrow indicates installation direction according to manuals schemes 3 Connect elements using profiles screws and nuts In this case no matter what element is on top 4 B...

Page 5: ...m 7 1 6 6 outside view angle 4Н 2 3 1 C B D F E 4Н 4Н 4В 4В 5 2 2 9 10 10 5 7 8 6 6 6 1 1 3 2 2 2 2 6 11 18 18 2 Figure 1 outside view inside view Figure 2 858 4060 1000 1000 1000 1000 2577 Layout of staying greenhouse supports on foundation Figure 4 А А D F E B C 60 21 DACHNAYA STRELKA extended by any number of inserts General view of Vstavka insert for DACHNAYA STRELKA greenhouse Each insert ext...

Page 6: ... On the site selected for greenhouse installation dig pits at a depth of shovel blade according to Fig 4 Install frame into the pits Check equality of frame diagonals using a cord Total draft of greenhouse into the ground should be so that bottom elements 6 of door opening touch the ground and elements 2 are about 5 cm above the ground Check equality of the diagonals using a cord again and correct...

Page 7: ... to arc 4в 9 10 4в 10 10 11 10 2 2 Assembly stages Figure 11 А D C B F Е Assembly manual Assembly manual 20 20 19 19 4н 4н 4н Door 14 12 13 14 15 B Figure 12 А 13 14 15 15 14 14 14 13 4н 9 18 18 10 19 20 13 14 12 12 15 15 13 14 13 12 12 12 12 12 15 13 А А D E F B B C Assembled door and end small window Assemble door and end small window from elements 12 13 14 15 Fig 12 Small window ...

Page 8: ...eycomb polycarbonate strictly facing sun with a side having protective layer by all means clarify it under purchase or before installing Protective layer usually is on the side with inscriptions on transport film On the other side of sheet film is clear After marking the sheet but before its cutting make marks on protective side of each piece of sheet after removal of transport film sheet sides ha...

Page 9: ...nd destruction of combs coverage coverage adhesive tape adhesive tape Figure16 3 Install side pieces of coverage in accordance with Fig 16 Holding a piece of coverage fasten it with screws and washers by elements 6 7 8 Fig 18 and by angles using tap screws Holes for screws are drilled by boring bit of 5 mm diameter from inside of greenhouse through holes in frame elements 4 Even coverage pieces by...

Page 10: ...ment 12 end coverage screw М5х35 screw М5х35 screw М5х10 screw М5х10 screw М5х35 hinge sealer hinges washer washer element 12 door Figure22 8 Install end washers in accordance with Fig 24 9 Install angle for hooks on end and door for its fixation in open state Fig 24 element 16 Figure24 end coverage 16 screw М5х50 screw М5х35 screw М5х35 element 5 sealer sealer sealer element 13 element 13 19 wind...

Page 11: ...sheet for width of arc profile Slide assembled ridge profile from end side for 11 For top coverage cut 6x2 1 m sheets in halves per 3x2 1 m pieces keeping right angle of cutting line to sheet side edge Then put halves together by cutting line with aligning the side edges and positioning protective layer outside Eliminate mismatch of edges after cutting halves and adding them together by cutting of...

Page 12: ...ure29 In this position use a pipe to bend linear part by hand into opposite direction Fig 31 Install the rotator on elastic headers Fig 32 Such a construction provides elastic tightness of the door in closed state both from inside and outside of the greenhouse Cutting and fastening of end coverage Figure30 Figure31 Figure32 17 17 bending pipe bending pipe 12 20 15 Wire rotator for small window loc...

Page 13: ...rer Volya LLC Dubna Moscow Oblast Phone fax 8 495 598 5 999 www perchina ru www domflora ru e mail info perchina ru EN This manual may not be reproduced in any form in full or partially without written permission of Volya Company ...

Reviews: