Group 20
Technical data
25
Tightening torques
Nm / angle tightening
(lbf.ft)
Group 22 Oil system
Oil cooler, screws ..................................................
21
(±2)
(
15.5
±1.5
lbf.ft)
Oil cooler, hollow screw
Step 1: ................................................................
80
(
59
lbf.ft)
Step 2: ................................................................
160
(
118
lbf.ft)
Oil cooler, screw plug .............................................
80
(
59
lbf.ft)
Front/oil pump housing ...........................................
21
(±2)
(
15.5
±1.5
lbf.ft)
Oil suction pipe ......................................................
21
(±2)
(
15.5
±1.5
lbf.ft)
Oil sump ................................................................
21
(±2)
(
15.5
±1.5
lbf.ft)
Oil pressure pipe turbo ...........................................
29
(±3)
(
21.4
±2.2
lbf.ft)
Oil pressure pipe engine block ...............................
39
(±4)
(
29
±3
lbf.ft)
Screws, oil return pipe turbo
A) with tube fitting ...............................................
40
(±2)
(
29.5
±1.5
lbf.ft)
B) with flange fitting ............................................
21
(±2)
(
15.5
±1.5
lbf.ft)
Screws, oil return pipe engine block .......................
21
(±2)
(
15.5
±1.5
lbf.ft)
Oil pressure switch ................................................
18
(±2)
(
13
±1.5
lbf.ft)
Group 23 Fuel system
Screw, governor, idler gear: ....................................
21
(
22.1
lbf.ft)
Screw, control rod socket ......................................
10
(±2)
(
7
±5
lbf.ft)
Screw, governor .....................................................
17
(±1.5)
(
12.5
±1
lbf.ft)
Flange screws, Injection pump
Step 1: Torque ....................................................
5
(
3.7
lbf.ft)
Step 2: Loosen screws for injection pump flange
60°
(counterclockwise)
Step 3: Turn injection pump to stop ....................
Counterclockwise
Step 4: ................................................................
tighten angularly
60°
Step 5: ................................................................
7
(
5
lbf.ft)
Step 6: ................................................................
10
(
7.4
lbf.ft)
Step 7: ................................................................
30
(
22
lbf.ft)
Flange screw, injector ............................................
19
(±2)
(
14
+1.5
lbf.ft)
Injector cap nut ......................................................
40 – 50
(
30 – 37
lbf.ft)
Delivery pipe
NOTE!
Use a new delivery pipe after every disassembly
NOTE!
Make sure that you use the same tightening torque for all delivery pipes
Step 1: ................................................................
5
(
3.7
lbf.ft)
Step 2: ................................................................
25
(+3.5)
(
18.4
±2.6
lbf.ft)
Screw, stop magnet ...............................................
21
(
15.5
lbf.ft)
Overflow valve .......................................................
30
(
22
lbf.ft)
Group 25 Inlet and exhaust system
Exhaust manifold nuts ...........................................
25
(±2.5)
(
18.5
±1.8
lbf.ft)
M8 Nuts, turbo to exhaust manifold .......................
21
(±2)
(
15.5
±1.5
lbf.ft)
M10 Nuts, turbo to exhaust manifold ......................
40
(±4)
(
29
±3
lbf.ft)
Screws, Inlet manifold ............................................
11
(±1)
(
8
±0.7
lbf.ft)
Group 26 Cooling system
Thermostat housing ...............................................
30
(
22.1
lbf.ft)
Temperature sensor ...............................................
21
(±2)
(
15.5
±1.5
lbf.ft)
Coolant pump .........................................................
21
(±2)
(
15.5
±1.5
lbf.ft)