12
whether the box appearance is intact;
●
Carefully handling during the unpacking. Protect the insulated
coating on the case surface;
●
Check the LFP battery for damage after unpacking. If there is any
damage, contact
Voltacon
.
6.3 The preparatory work
1. Make sure the POWER buttons of all batteries are off
2. Ensure the charging voltage of power supply equipment is
DC53.5±0.5V
3. All power supply should be off
6.4 Installation
6.4.1 Install the battery
The
Li2021 48V50Ah LFP
can be installed either vertically or
horizontally.
In this chapter, it’s the main instructions for horizontal installation such
VOLTACON Li2021 BATTERY 2.4KWH 48V User Manual