4 / 12
5. Connect backstay crane, forestay crane , short mast, shrouds cross, long mast and the pre-installed
main sail & boom by the order of above instruction. Remember to hang the main sail on the mast with the
6pcs luff rings.
=
1. Setup the display base as shown in picture.
Insert the tubes into the sockets, no gluing is
required.
Installation and Rigging Guide
2. Setup the keel, water-proof rubber piece and
ballast by HM5*50mm screw, using a H4.0mm
allen key.
3. Setup the keel, water-proof rubber piece into
hull by HM5*90mm screw, using a H4.0 mm
allen key.
4. Insert the rudder from hull bottom to deck
through a rudder arm, connected with a clip,
make sure rudder is able to rotate freely. Then
insert push rod through the knob on rudder
arm, keep rudder in center position and tighten
the knob with a H2.0mm allen key. Stick the
waterproof cover to the deck.
Summary of Contents for Hurricane 791-2
Page 1: ......