HIGH LIMIT THERMOSTAT (see fig. 25)
Carry out component removal procedure as
described in 6.4.
Unclip and remove the air chamber cover.
Pull off electrical connections from the high limit
thermostat (2), slacken and remove retaining
screws (3). Replace in reverse order.
6.12
PRINTED CIRCUIT BOARD (see fig. 26)
Carry out component removal procedure as
described in 6.4.
Locate and remove the screws (1) which secure
the PCB cover & terminal cover, then remove
cover, after carefully taking note of all wiring
connections, disconnect all wiring from the PCB,
locate and remove the PCB securing screws
(2,3,), remove the required PCB (4,5,6). Replace
in the reverse order.
Fig. 24
Fig. 25
NOTE
Ensure that any replacement PCB has the correct
‘Jumper Tag’ configuration (see section 8).
6.13
GAS VALVE (see fig. 27)
Carry out component removal procedure as
described in 6.4.
The gas valve must be changed as complete unit.
Disconnect the electrical plug and leads from the
gas valve. Slacken and unscrew gas valve inlet
and outlet connections (3). Please note, the
sealing washers (2) must be discarded and
replaced with new sealing washers (2). Locate
and remove gas valve retaining screws on the
underside of the boiler if required, the gas valve
can now be removed. Replace in the reverse
order. Check and adjust burner pressure settings.
WARNING, A GAS SOUNDNESS CHECK
MUST BE CARRIED OUT.