8
3A.6.5 EXPANSION VESSEL
The appliance has an integral expansion vessel
to accommodate the increased volume of water
when the system is heated. It can accept up to
10 litres of expansion from within the system,
generally this is sufficient, however if the system
has an unusually high water content, it may be
necessary to provide additional expansion
capacity.
3A.6.6 FILLING POINT
A method for initial filling of the system and
replacing water lost during servicing etc. is
required (see fig. 14). You should ensure this
method of filling complies with the local water
authority regulations.
3A.6.7 LOW PRESSURE SEALED SYSTEM
An alternative method of filling the system would
be from an independent make-up vessel or tank
mounted in a position at least 1 metre above the
highest point in the system and at least 5 metres
above the boiler (see fig. 5).
The cold feed from the make-up vessel or tank
must be fitted with an approved non-return valve
and stopcock for isolation purposes. The feed
pipe should be connected to the return pipe as
close to the boiler as possible.
3A.6.8 FREQUENT FILLING
Frequent filling or venting of the system may be
indicative of a leak. Care should be taken during
the installation of the appliance to ensure all
aspects of the system are capable of withstanding
pressures up to at least 3 bar.
3A.7
ELECTRICAL SUPPLY
The appliance is supplied for operation on 230V
@ 50Hz electrical supply; it must be protected
with a 3-amp fuse. The method of connection to
the mains electricity supply must allow for
complete isolation from the supply. The preferred
method is by using a double-pole switch with a
contact separation of at least 3mm. The switch
must only supply the appliance and its
corresponding controls, i.e. time clock, room
thermostat, etc.
3A.8
MOUNTING ON A COMBUSTIBLE SURFACE
If the appliance is to be fitted on a wall of
combustible material, a sheet of fireproof material
must protect the wall.
3A.9
TIMBER FRAMED BUILDINGS
If the appliance is to be fitted in a timber framed
building, it should be fitted in accordance with
I.S. 813 and local Building Regulations.
The Institute of Gas Engineers publication (IGE/
UP/7) ‘Guide for Gas Installations in Timber
Frame Buildings’ gives specific advice on this type
of installation.
3A.10 INHIBITORS
Vokera recommend that a inhibitor - suitable for
use with low water-content, copper heat
exchangers - is used to protect the boiler and
system from the effects of corrosion and/or
electrolytic action. The inhibitor must be
administered in strict accordance with the
manufacturers* instructions.
*Fernox and Sentinel manufacture products that
have proved suitable for use with Vokera
appliances. Vokera Ltd. cannot comment on the
suitability of any other such product with our
appliances.
3A.11 DECLARATION OF CONFORMITY
A Declaration of Conformity (as defined in I.S.
813) must be provided on completion of the
installation.
A copy of the declaration must be given to the
responsible person and also to the gas supplier
if required.