Installation Instructions
© BTG 2020
User Manual CPM II2066en Rev. C
19
3.1.3.2
HCM Connections
The Hart communication module (HCM-80xx) is using HART
®
protocol.
NOTE!
Before installation, ensure that all power to the system has been turned off.
Cable connections must be made by authorized personnel.
NOTE!
Figure 9 shows resistance as a function of supply voltage. The grey area is
accepted. The resistance is the sum of cable- and power source- resistance in
the current loop. The HART
®
communication requires a minimum resistance of
250
1. Insert the signal cable through the cable gland.
2. Connect the cable to the HCM as shown on the following page.
NOTE!
The connection blocks can be released from the connection module for easier
access, as shown in figure 10 below.
3. Connect the shield to the upper connection point on the shield filter module
(SFM-8000).
CAUTION!
The cable shield must always be connected to the upper connection point on
the shield filter module, and kept separated from the transmitter cable shield.
DANGER
Hazardous voltage
in the equipment
Fig 9 Analog Out 4-20 mA
Analog Out DCS
(
) 4-20 mA
0
8
14
250
35 (Max)
V
730
1200
W
24
A
Fig 10 Releasing the
connection blocks
Summary of Contents for BTG CPM-1300
Page 1: ...User Manual CPM Communication Platform...
Page 18: ...Product Introduction 14 User Manual CPM PI2066en Rev C BTG 2020...
Page 34: ...Service Instructions 30 User Manual CPM SI2066en Rev A BTG 2020...
Page 50: ...Parts List 46 User Manual CPM PL2066en Rev A BTG 2020...
Page 60: ...Appendix 56 User Manual CPM AX2066en Rev C BTG 2020...
Page 61: ......
Page 62: ...BTG Instruments AB P O Box 602 SE 661 29 S ffle Sweden Phone 46 533 426 00 www btg com...