Gland Packing
Seal Assembly
-
Cable gland box
-
Lantern Ring
-
Short shaft sleeve
-
Spacer sleeve
-
Packing
-
Shaft sleeve O'ring
-
Press
Steps to follow:
1. Assemble stuffing box.
2. Install shaft sleeve.
3. Install spacer sleeve. Make sure that the water inlet is in the position of the water line.
4. Leave system loose awaiting installation of press housing.
5. Once the system is installed with the casing in place, insert the lantern ring and the respective gaskets according to
figure 15.
6. Apply anti-seize lubricant to the shaft threads.
Figure 15. Placement of stuffing box, lantern ring, packing, shaft sleeve, spacer ring and shaft sleeve O-ring
Gland Packing
Seal Assembly
10.1
Installation of Cable Gland System with the Following Components (fig. 15)