
20
Parts and
Assembly
Figure 10. Verification of axial clearance - Vertical
7.
8
Smaller Sizes (2-3-4-5)
In horizontal position add a mounting bracket with a dial indicator secured to the cover as shown in figure 9. Rotate the
shaft and record the maximum and minimum.
7.
9
Larger Sizes (6-18-19-2021-2122)
Position the bearing holder vertically as shown in figure 10 and repeat the process above leaving the pump side shaft
upwards.
Parts and
Assembly
Summary of Contents for 100/75 HAD
Page 1: ......