Depósito legal y copyright 2014. Todos los derechos reservados.
4
PRO LIFTS S.L.
SMART TOWERS
USER MANUAL
CONTENTS
1. Introduction.
2. Technical information.
3. Operating instructions.
4. Maintenance.
5. Guarantee
1. INTRODUCTION
Dear costumer: Thank you for the pur-
chase of your new VMB SMART TOWER,
now you will have the electronic con-
trol of the stabilization, the weight of
the load the tower is carrying, and
you will be able to know how high the
load is thanks to the height measure-
ment tape attached to the side of the
towerlift.
In order to ensure a safe and reliable
operation of the SMART TOWER, plea-
se follow the instructions in this booklet
carefully. Before operating the lift,
read the instructions completely and
please note the technical information
contained within this manual.
All VMB products undergo very rigo-
rous testing, under strict conditions
and they are monitored continuously
during the manufacturing process.
In order to guarantee the lifts function
and safety, only original parts from the
manufacturer must be used. If any
parts other than those of the manu-
facturer are used, or the product is
modifi ed in any way, the user forfeits
all warranty rights to claim. VMB re-
serves the right to modify the product
specifi cations without prior notice.
The model type, production year and
serial number must be quoted in any
queries or orders for spare parts.
2. TECHNICAL INFORMATION
SMART TOWER MAIN CONTROL
COMPONENTS:
- Control device
- Calibrated load cell
- Inclinometer
- Height measurement tape
- 2 repleaceble batteries AA (1.5V)
3. OPERATING INSTRUCTIONS
3.1 - START SMART DEVICE:
Before starting the device, place the
towerlift on a fi rm, fl at surface and in-
sert the legs in their working position,
then place the forks in their working
position as well, and fi nally place the