
Procedure
1). Confirm that both the 2-way and 3-way valves are set to the opened position
Remove the valve stem caps and confirm that the valve stems are in the opened position.
Be sure to use a hexagonal wrench to operate the valve stems.
2). Connect the charge hose with the push pin of handle lo to the 3-way valves gas service port.
3). Air purging of the charge hose.
Open the handle Lo valve of the manifold valve slightly to purge air from the charge hose for 5 seconds and
then close it quickly.
4). Set the 2-way valve to the close position.
5). Operate the air conditioner at the cooling cycle and stop it when the gauge indicates 0.1MPa.
6). Set the 3-way valve to the closed position immediately
Do this quickly so that the gauge ends up indicating 0.3 to 0.5Mpa.
Disconnect the charge set, and tighten the 2-way and 3-way valve’s stem nuts.
Use a torque wrench to tighten the 3-way valves service port cap to a torque of 1.8 kgf.m.
Be sure to check for gas leakage.
2. Air purging by the refrigerant
Summary of Contents for ACP-18COFM50AECI
Page 2: ......
Page 10: ...4 Wiring Diagram ACP 18COFM50AECI ...
Page 11: ...ACP 27COFM79AECI ACP 28COFM82AECI ...
Page 12: ...ACP 41COFM123AECI ACP 36COFM105AECI ...
Page 41: ...10 3 1 2 Indoor outdoor units communication error ...
Page 48: ...10 3 2 2 Communication malfunction between IPM board and outdoor main board ODU E3 ...
Page 63: ......
Page 64: ...www VIVAX com ...