
Procedure:
1). Confirm that both the 2-way and 3-way valves are set to the closed position.
2). Connect the charge set and a charging cylinder to the service port of the 3-way valve.
3). Air purging.
Open the valves on the charging cylinder and the charge set. Purge the air by loosening the flare nut on the
2-way valve approximately 45’ for 3 seconds then closing it for 1 minute; repeat 3 times.
After purging the air, use a torque wrench to tighten the flare nut on the 2-way valve.
4). Check the gas leakage.
Check the flare connections for gas leakage.
5). Discharge the refrigerant.
Close the valve on the charging cylinder and discharge the refrigerant by loosening the flare nut on the
2-way valve approximately 45’ until the gauge indicates 0.3 to 0.5 Mpa.
6). Disconnect the charge set and the charging cylinder, and set the 2-way and 3-way valves to the open
position.
Be sure to use a hexagonal wrench to operate the valve stems.
7). Mount the valve stems nuts and the service port cap.
Be sure to use a torque wrench to tighten the service port cap to a torque 18N
∙
m.
Be sure to check the gas leakage.
3. Adding the refrigerant if the pipe length >5m
Summary of Contents for ACP-18COFM50AECI
Page 2: ......
Page 10: ...4 Wiring Diagram ACP 18COFM50AECI ...
Page 11: ...ACP 27COFM79AECI ACP 28COFM82AECI ...
Page 12: ...ACP 41COFM123AECI ACP 36COFM105AECI ...
Page 41: ...10 3 1 2 Indoor outdoor units communication error ...
Page 48: ...10 3 2 2 Communication malfunction between IPM board and outdoor main board ODU E3 ...
Page 63: ......
Page 64: ...www VIVAX com ...