
Service manual
13
7.5
Pumping down (Re-installation)
Procedure
Confirm that both the 2-way and 3-way valves are set to the opened position.
Remove the valve stem caps and confirm that the valve stems are in the opened position.
Be sure to use a hexagonal wrench to operate the valve stems.
Operate the unit for 10 to 15 minutes.
Stop operation and wait for 3 minutes, then connect the charge set to the service port of the 3-way valve.
Connect the charge hose with the push pin to the gas service port.
Air purging of the charge hose.
Open the low-pressure valve on the charge set slightly to purge air from the charge hose.
Set the 2-way valve to the close position.
Operate the air conditioner at the cooling cycle and stop it when the gauge indicates 0.1MPa.
Immediately set the 3-way valve to the closed position.
Do this quickly so that the gauge ends up indicating 0.3 to 0.5Mpa.
Disconnect the charge set, and amount the 2-way and 3-way valve
’
s stem nuts and service port caps.
Use a torque wrench to tighten the service port cap to a torque of 1.8 kg.m.
Be sure to check for gas leakage.
Summary of Contents for ACP-09CH25AEM
Page 1: ...ACP 09CH25AEM ACP 12CH35AEM ACP 18CH50AEM RoHS Service manual ENG ...
Page 2: ......
Page 12: ...Service manual 8 4 Refrigerant cycle diagram Cooling only Heat pump mode ...
Page 35: ......
Page 36: ......
Page 37: ......