1-2 Bathtub must be carried upside down. It must never be carried by holding from its panel.
3- In this series a ‘hidden overflow’ is installed to plain and hydro massage bathtubs by the manufacturer. Therefore the product comes with the
siphon installed. The bathtub is placed on the installation area and the perimeter of its bottom is marked. Inside the marked area, the 50
mm diameter waste water drain pipe is installed from the center shown in the drawing, at the point indicated by the letter “A”, and the water
inlet pipes are installed to the centerline of the faucet above the bathtub, at the point indicated by the letter “C", as illustrated in the technical
diagram. If this is a hydro massage (hydro massage) bathtub, a 220 V phase, neutral and earth electric lines are required to be connected
inside the marked area, in accordance with the orientation of the bathtub (seethe area indicated by the letter “E").No water drain muff should
be left in the area indicated by the letter “B”. External faucet application should be carried with a minimum distance of 100mm to the bathtub
and in accordance with the bathtub placement. The axle distance between the hot and cold water inlet pipes should be adjusted in
accordance with the technical drawing of the faucet. (See the Technical Data Sheet for the technical scheme).
7- The parts of the bathtub’s monobloc sides that touch the floor should be marked. The panel supporting brackets should be pulled inside at
the thickness of the acrylic and they should be fixed to the floor with silicone. Accordingly, movement of the bathtub on the floor is
prevented.
8- The siphon drain pipe connection and also the electrical connection (if the product is hydromassage) of the bathtub should be made.
9- Tighten the leg set nuts.
10- Apply silicone on the bathtub legs’ parts which contact the floor.
11- When the infrastructure installation is completed the taken down from the bearing supports. When deemed necessary apply silicone to
several points between the bathtub panel and the floor and complete the installation
12- The installation of the monobloc bathtub is completed. Any remaining protective folio on the bathtub should be removed only after the
bathtub installation and any other construction works in the bathroom are finished.
4-5 The bathtub is taken into level using a scale at the installation area.
6- For the infrastructure installation, the bathtub is placed on bearing supports at the installation area.
Caution:
During the infrastructure installation, the bathtub should not be tilted sideways and no weight should be placed on its side panels.