9
070.02.1704
Insert cropped head bolt (1412) into the bolt
channel at the bottom of corner bar (7310) and
connect parts (1405) and (1409) with aluminium
nut (1002) on both sides (9.3). Fit elbow (1402)
onto the bottom of down pipe (1415) (9.6) and
then connect this to the eave plastic (7370) or
(7371) (9.9). Fit the down pipe clamp (1403)
around the down pipe and connect to (1409)
(9.4). Insert screw (1006) to fix the down pipe in
place (9.5).
Assemble door track (7359) into the door ope-
ning. Connect to (7444 / 7446) by inserting bolts
(7052) into the bolt channel on the outside of
these bars and connect with nuts (7053) (9.7).
Include at both ends of door track bar (7359) bolt
(7052) from outside and nut (3002) inside the
door guide to prevent the door from sliding out of
the track (9.7) (9.8).
Position the doors by inserting the plastic door
guides (2271) into the guide in door track bar
(7359) (9.9) (9.10a) and then lower the wheels
onto the door track on bar (7351) (9.10b). Hook
the door jump clips (7350) under the lip on (7351)
and tighten the lock nuts (7360) (9.10b).
Connect plastic nut caps (6070) by pushing them
onto all visible nuts (7053) inside the building
(9.11).
FINIShINg
If desired, it is possible to further seal the green-
house at the edges using neutral silicone. Silicone
is not included for this purpose.
Place the warning label inside the house.
Please check the tightness of all nuts and bolts
two weeks after completing the assembly.
A full range of greenhouse accessories, to help
you make the most of this product, is available
from your stockist. Please take a look at the pos-
sibilities.
SaFety NotIce
In the event of high wind conditions, close the
doors and all vents.
In the event of heavy snowfall, clear the roof of
the building or take suitable measures to support
the roof. Heat the building in winter.
commeNtS
For the complete protection of your new green-
house, we advise you to include it in your
house
insurance.
Please take note of possible building
rules relating to the positioning of greenhouses.
Please stick the included greenhouse model label
onto door bar (7352) or (7353) after success fully
assembling this product. This information is im-
portant in the event that replacement parts are
later required.
Please keep these assembly instructions in a
safe place, for future reference!
Our policy is one of continuous improvement and
we reserve the right to change the specifications
without prior notice.