Trimline 70 SL
15
9.4 Parts
Check all parts for damage before commencing the
installation. For the conversion of a brick flue to concentric
flue, connected to CC flue system, you need the components
described in Appendix 2.
Comment: The renovation/sanitation set consists of parts:
4. Interior mounting plate
5. Sliding element
8. Chimney mounting plate
9.5 Installation
•
Guide the flexible hose (6) through the existing flue (7).
•
Attach the slider (5) to the bottom of the flexible hose and
secure this in place using two Parker screws.
•
Keep the bottom of the slider at the same height as the
bottom of the flue or ceiling.
•
Shorten the flexible hose to approximately 100mm above
the chimney coping.
•
Attach the mounting plate to the flexible hose on the roof
(8), clamp it with a hose bracket.
•
Stainless steel round 90 to 165, secure the whole with
Parker screws.
•
Attach the mounting plate to the chimney coping watertight
on the roof (8) using silicone sealant and stainless steel
screws.
•
Install the roof pass-through (9) and secure it in place using
the supplied clamping strip (10).
•
The slider (5) will protrude approximately 100mm
underneath the flue or ceiling after installation.
•
Attach the inner mounting plate (4) gastight against the
bottom of the structural flue or against the bottom of the
concrete floor using silicone sealant and screws.
•
Position the unit in accordance with the instructions of the
unit manufacturer
•
Install a minimum of 1 metre of concentric flue type
THC CC (2).
•
Extend the concentric flue using sections (2) up to a
minimum of 100mm in the structural duct. Finally, turn
the clamping strip by hand in the mounting plate inside (3).