background image

Loader assembly

Remove nuts A, washers B and screws C 

from their housing.

Position loader D and attach with nuts A,  

washers B and screws C.

Make sure that loader belt rollers E turn 

freely.

B

A

D

C

E

UNPACKING, INSTALLATION AND PRIOR ASSEMBLIES

1) Unpack and install the machine as per the paragraphs 4.1, 
4.2 and 4.3 of the instructions manual.
2) Proceed with the prior assemblies (SEE PART "ASSEM-
BLIES").
3) Connect the machine to the mains as per the paragraph 4.5 
of the instructions manual.
4) Proceed to connect the machine to the compressed air 
source as per the paragraph 4.6 of the instructions manual.
5) Connect the dust collector pipe (1), as per paragraph 2 of 
the annex to the instructions manual.
6) Unlock the compressed air valve (3) and be sure that the 
machine has at least a pressure of 6 bar, showed on the pres-
sure indicator.
7) Switch on the machine by means of the main switch (5).

Wheel assembly

Mount the crank A on the wheel B, using 

the service key.

ASSEMBLIES

8 - 

EB140PLC Premilling

 / Quick start guide

Summary of Contents for 8500699

Page 1: ...Aplacadora de cantos autom tica de cola caliente Automatic hot melt edgbander with glue pot and pre milling unit EB140PLC Pre Milling GUIA R PIDA DE PUESTA EN MARCHA QUICK START GUIDE P g 2 Pag 7...

Page 2: ...esi n 5 Interruptor general 6 Caja de conexi n el ctrica 7 Indicador de presi n 8 Pulsador paro de emergencia 9 Pulsador de paro 10 Pulsador de marcha 11 Piloto de alimentaci n el ctrica a red 12 Pilo...

Page 3: ...la general de aire 3 y aseg rese que la m quina tiene una presi n de 6 bares visualizando el indi cador de presi n 7 Para la regulaci n de la presi n realice las instrucciones expuestas en el punto 5...

Page 4: ...is 21 Advertencia en caso de trabajar con cola PUR 22 Versi n del firmware 23 Fecha y hora 22 15 16 17 18 19 20 21 Montaje de los suplementos mesa Colocar los suplementos mesa A en la entrada y salida...

Page 5: ...xi n el ctrica es erronea puede dar lugar a situaciones de peligro para los usua rios o da os irreparables para la m quina Para la comprobaci n se realizar un primer paso de tablero siguiendo las indi...

Page 6: ...arpadea Confirmaci n de trabajo Presionando el pulsador de marcha 10 se confirma la acci n de trabajo el piloto de funcionamiento 13 se queda fijo y la m quina esta lista para iniciar el aplacado El r...

Page 7: ...egulator 5 Main switch 6 Electrical power terminal box 7 Pressure indicator 8 Emergency stop button 9 OFF button 10 ON button 11 Electrical connection light 12 Warning light 13 ON light 14 Screen QUIC...

Page 8: ...nnect the machine to the mains as per the paragraph 4 5 of the instructions manual 4 Proceed to connect the machine to the compressed air source as per the paragraph 4 6 of the instructions manual 5 C...

Page 9: ...Autodiagnosis 21 Warning when working with PUR glues 22 Firmware version 23 Date and hour 22 15 16 17 18 19 20 21 8 Welcome screen Assembly of table inserts Place the table inserts A at the entrance a...

Page 10: ...ng on the machine for the first time please read carefully and follow the instructions explained in the FIRST JOB GUIDE 4 Put a panel on the table 25 and introduce it in the feeder 24 checking that th...

Page 11: ...eady to work The ON light 13 flickers Working confirmation Pressing the ON button 10 the working status of the ma chine is confirmed the ON light 13 remains fixed and the machine is ready to work The...

Page 12: ...Virutex S A Av de la Llana 57 08191 Rub Barcelona Spain www virutex com 8596130 102020 http www virutex es registre Acceda a toda la informaci n t cnica Access to all technical information...

Reviews: