background image

** BEFORE BEGINNING INSTALLATION OPEN ALL PACKAGES AND CHECK CONTENTS OF SHIPMENT.
    PLEASE REPORT ANY SHORTAGES DIRECTLY TO VINTAGE AIR WITHIN 15 DAYS.  AFTER 15 DAYS,
    VINTAGE AIR WILL NOT BE RESPONSIBLE FOR MISSING OR DAMAGED ITEMS. 

1

2

3

1969 CAMARO 

 

w/o FACTORY AIR

   905070-VCZ-A 

, 69 CAMARO w/o FAC. AIR INSTRUCTIONS  PG 3 OF 20  

11/22/05

1.
2.

1
1

761169-VCE
782169-FCN

EVAPORATOR SUBCASE
1969 CAMARO w/o AC ACCESSORY KIT

No.    QTY.     PART No.             DESCRIPTION

EVAPORATOR KIT

55070-VCZ-A

EVAPORATOR KIT PACKING LIST

1969 CAMARO  

w/o FACTORY AIR

EVAPORATOR

761169-VCE

ACCESSORY KIT

782169-FCN

Summary of Contents for 55070-VCZ-A

Page 1: ...18865 GOLL ST SAN ANTONIO TX 78266 ph 210 654 7171 fax 210 654 3113 1969 CAMARO w o FACTORY AIR 55070 VCZ A 905070 VCZ A 69 CAMARO w o FAC AIR INSTRUCTIONS PG 1 OF 20 11 22 05...

Page 2: ...ALLATION FIGURES 6 7B EVAPORATOR INSTALLATION CONT FIGURES 8 8C DUCT HOSE INSTALLATION FIGURE 9 ENGINE COMPARTMENT FIGURE 10 CONDENSER ASSEMBLY COMP BRKT PULLEYS FIGURES 11 11B CONDENSER INSTALLATION...

Page 3: ...E RESPONSIBLE FOR MISSING OR DAMAGED ITEMS 1 2 3 1969 CAMARO w o FACTORY AIR 905070 VCZ A 69 CAMARO w o FAC AIR INSTRUCTIONS PG 3 OF 20 11 22 05 1 2 1 1 761169 VCE 782169 FCN EVAPORATOR SUBCASE 1969 C...

Page 4: ...A BINARY PRESSURE SAFETY SWITCH A BINARY SWITCH 11078 VUS DISENGAGES THE COMPRESSOR CLUTCH IN CASE OF EXTREME LOW PRESSURE CONDITION REFRIGERANT LOSS OR EXCESSIVELY HIGH HEAD PRESSURE 406 PSI TO PREV...

Page 5: ...OLUMN BOTTOM COVER 5 REMOVE AND DISCARD VENT DUCTS ON DRIVER PASSENGER SIDE 6 7 REMOVE AND DISCARD OEM DUCT HOSE 8 REMOVE THE GLOVE BOX DOOR 11 AND RETAIN REMOVE AND DISCARD THE OEM GLOVE BOX 9 REMOVE...

Page 6: ...ST CABLE 19 1 2 BLOWER SWITCH DEFROST CONTROL CABLE INSTALLATION REMOVE AND DISCARD 3 OEM CONTROL CABLES FROM CONTROL PANEL SEE FIGURE 2 ATTACH NEW CABLES PROVIDED TO CONTROL PANEL LEVERS AS SHOWN IN...

Page 7: ...EVAPORATOR FIREWALL USE THE OEM HEATER MOUNTING HOLE IN FIREWALL TO MOUNT THE FIREWALL COVER APPLY A 1 4 BEAD OF SILICONE AROUND THE PERIMETER OF THE FIREWALL COVER AND INSTALL SECURE USING 4 1 4 x 1...

Page 8: ...ES 7A 7B BELOW INSTALL THE DRIVER SIDE MOUNTING BRACKET AND THE BLOWER HOUSING MOUNTING BRACKET SEE FIGURE 7 BELOW SECURE BRACKETS USING 2 8 x PH PAN HEAD SCREWS FIGURE 6 EVAPORATOR ROTATE THE UNIT 90...

Page 9: ...FROM THE ENGINE COMPARTMENT SIDE SEE FIGURE 8B BELOW ATTACH THE BLOWER HOUSING MOUNT BRACKET IN FRONT OF THE VENT DUCT COVER ON THE PASSENGER SIDE OF THE DASH SECURE USING OEM BOLT SEE FIGURE 8C BELOW...

Page 10: ...ENGER SIDE OEM LOUVER CENTER LOUVER EVAPORATOR 2 x 15 DEFROST DUCT HOSE 2 x 13 DEFROST DUCT HOSE 2 1 2 x 36 A C DUCT HOSE 2 1 2 x 26 A C DUCT HOSE 2 2 x 15 A C DUCT HOSE DRAIN HOSE OEM U NUT USING THE...

Page 11: ...C G WITH OUTLETS FACING UP IN MOST INSTANCES THE BELT LENGTHS WILL REMAIN THE SAME COMPRESSOR BRACKETS PULLEYS CONDENSER ASSEMBLY THE CONDENSER ASSEMBLY MOUNTS TO THE FRONT SIDE OF THE CORE SUPPORT LO...

Page 12: ...IER CLAMPS FIGURE 12a FIGURE 12 FLAT WASHERS FLAT WASHERS LOCK WASHERS NUT 5 16 BOLT FLOW IN OUT 12 CONDENSER INSTALLATION FIGURE 12B 1969 CAMARO w o FACTORY AIR 905070 VCZ A 69 CAMARO w o FAC AIR INS...

Page 13: ...AMPS AND TWO 2 EACH 10 32 x 1 2 MACHINE SCREWS AND NUTS SEE FIGURE 13 DRILL 3 16 HOLES IN THE INNER FENDER PANEL RECAP THE END OF THE HARDLINE TO KEEP CLEAN FIGURE 13 FIGURE 13a DRIER CONDENSER CONDEN...

Page 14: ...OTE WRAP THE 10 FITTING CONNECTIONS WITH PRESS TAPE SEE FIGURE 14b PAGE 15 LOCATE THE 6 EVAP DRIER HARDLINE AND LUBRICATE 2 6 O RINGS SEE FIGURE 11a PAGE 11 AND CONNECT THE HARDLINE TO THE 6 HARDLINE...

Page 15: ...N IN FIGURE 14b BELOW NOTE PROPER FLOW DIRECTION INSTALL FIREWALL COVER CAP USING 3 10 x SHEETMETAL SCREWS SEE FIGURES 14a 14b BELOW ROUTE VACUUM LINES THROUGH THE GROMMET WITH THE 6 EVAPORATOR HARDLI...

Page 16: ...SCREWS EVAPORATOR 1 4 20 x 1 BOLT w WASHER FRESH AIR COVER INSTALLATION APPLY A 1 4 BEAD OF SILICONE AROUND THE BACK SIDE OF THE FRESH AIR CAP AS SHOWN IN FIGURE 15 ATTACH FRESH AIR CAP TO FIREWALL U...

Page 17: ...ED ANTIFREEZE AND DISTILLED WATER IT IS THE OWNERS RESPONSIBILITY TO KEEP THE FREEZE PROTECTION AT THE PROPER LEVEL FOR THE CLIMATE IN WHICH THE VEHICLE IS OPERATED FAILURE TO FOLLOW ANTIFREEZE RECOMM...

Page 18: ...TION THE THERMOSTAT IS SET TOO WARM SET THE THERMOSTAT COLDER CLOCKWISE 10 OF A TURN EACH ADJUSTMENT UNTIL THE COMPRESSOR CLUTCH CYCLES INFREQUENTLY AVOID SETTING THE THERMOSTAT TOO COLD 3 SYMPTOM THE...

Page 19: ...ER LOUVER TEMPLATE PLACE ALONG EDGE OF DASH BOARD START ON OEM MARK ON DASH BOARD 2 7 3 4 WIRING DIAGRAM 1969 CAMARO w o FACTORY AIR HEATER VALVE VACUUM TUBING RED ENGINE VACUUM TUBING BLACK VENT 9050...

Page 20: ...CHECKED BY PACKED BY DATE No QTY PART No DESCRIPTION EVAPORATOR KIT 55070 VCZ A EVAPORATOR KIT PACKING LIST 1969 CAMARO w o FACTORY AIR 1969 CAMARO w o FACTORY AIR EVAPORATOR 761169 VCE 905070 VCZ A...

Page 21: ...ARGE PASSENGER SIDE VENT ADAPTER 69 CAMARO W O AC WIRING KIT GLOVE BOX 69 CAMARO PASS SIDE FRESH AIR COVER ASM 69 CAMARO DR SIDE FRESH AIR COVER ASM 69 CAMARO W O AC INSTALLATION KIT DEFROST DUCT ASM...

Page 22: ...9 CAMARO CENTER LOUVER w 2 2 HOSE ADPTR S CLIPS 4 x 3 4 COUNTER SUNK SCREW 1 3 2 CHECKED BY PACKED BY DATE 4 900169 FCA REV A 12 6 05 69 CAMARO w o FAC AIR CENTER LOUVER ASSEMBLY KIT PG 1 OF 1 CENTER...

Page 23: ...P WIRE HARNESS 30 BLACK JUMPER WIRE SINGLE WIRE DIODE CHECKED BY PACKED BY DATE 1 2 3 4 WIRE HARNESS JUMPER WIRE SINGLE WIRE DIODE 23269 FCA 6 29 04 69 CAMARO w o FAC AIR WIRING KIT PG 1 OF 1 WIRING K...

Page 24: ...11 12 8 6 1 10 10 6 20 1 1 3 1 1 31050 VUD 18290 VUB 46103 VUH 18233 VUB 18235 VUB 18125 VUB 49003 VUP 64064 VCB 64065 VCB 18247 VUB 091692 FCL 33857 VUF DRAIN HOSE x 1 COARSE BOLT HEATER CONTROL VALV...

Page 25: ...FAC AIR INSTALLATION KIT PG 1 OF 1 1 2 3 4 5 6 7 8 9 8 6 1 10 10 6 20 1 1 31050 VUD 18290 VUB 46103 VUH 18233 VUB 18235 VUB 18125 VUB 49003 VUP 64064 VCB 64065 VCB DRAIN HOSE x 1 COARSE BOLT HEATER CO...

Reviews: