![Vintage Air 55070-VCZ-A Manual Download Page 15](http://html1.mh-extra.com/html/vintage-air/55070-vcz-a/55070-vcz-a_manual_1028528015.webp)
15
1969 CAMARO
w/o FACTORY AIR
ROUTE A PIECE OF HEATER HOSE FROM THE WATER PUMP TO THE
FIREWALL AND ATTACH IT TO THE HEATER LINE FROM EVAPORATOR AS SHOWN
IN FIGURES 14a, BELOW. SECURE USING HOSE CLAMPS.
ROUTE A PIECE OF HEATER HOSE FROM THE INTAKE MANIFOLD, TO THE
FIREWALL AND ATTACH IT TO THE HEATER LINE FROM EVAPORATOR AS
SHOWN IN FIGURES 14a, BELOW. NOTE: INSTALL HEATER CONTROL VALVE
IN-LINE WITH INTAKE MANIFOLD (PRESSURE SIDE) HEATER HOSE,
SECURE USING HOSE CLAMPS AS SHOWN IN FIGURE 14b, BELOW.
NOTE PROPER FLOW DIRECTION
.
INSTALL FI
RE
WALL COVER CAP USING (3) #10 x ½”
SHEETMETAL SCREWS. SEE FIGURES 14a & 14b, BELOW.
ROUTE VACUUM LINES THROUGH THE
GROMMET WITH THE #6 EVAPORATOR
HARDLINE AS SHOWN 14b , BELOW
,
HEATER HOSE & HEATER CONTROL VALVE INSTALLATION
FIGURE 14a
905070-VCZ-A
, 69 CAMARO w/o FAC. AIR INSTRUCTIONS PG 15 OF 20
11/22/05
5/8” HEATER
HOSE
ENGINE &
HEATER VALVE
VACUUM
FIREWALL
COVER CAP
TO WATER PUMP
SCREWS
(3) #10 SHEETMETAL
#6 O-RING
#6 HARDLINE
TO INTAKE
MAINIFOLD
5/8” HEATER
HOSE
TO WATER PUMP
TO INTAKE MAINIFOLD
HOSE
CLAMP
HEATER
VALVE
5/8” HEATER HOSE
5/8” HEATER
HOSE
HOSE
CLAMP
FIGURE 14b
#10 O-RING
#10 AC HOSE
ENGINE
VACUUM
HEATER VALVE
VACUUM