8
901301 REV D 10/27/14, SLIMLINE HC PG 8 OF 12
FOR A PROPER SEAL
OF FITTINGS
INSTALL SUPPLIED
O'RINGS AS SHOWN
AND LUBRICATE
WITH SUPPLIED OIL.
FIGURE 3
ROUTE HEATER HOSES (REFER TO HEATER HOSE ROUTING INSTRUCTIONS, PG. 9).
MAKE ELECTRICAL AND/OR VACUUM CONNECTIONS, ACCORDING TO THE DIAGRAM FURNISHED
ON PG. 10.
NOTE: THE RED 12GA. WIRE WITH THE 30 AMP CIRCUIT BREAKER SHOULD BE CONNECTED TO A 12
VOLT POWER SOURCE OF AT LEAST 12GA. WIRE. CONNECT MOLDED PLUG WITH THE (RED, YELLOW,
ORANGE) WIRES TO THE CORRESPONDING PLUG FROM THE BLOWER MOTOR. THE SINGLE BLACK WIRE
FROM THE BLOWER MOTOR MUST BE GROUNDED. THE BLUE CLUTCH WIRE RUNS FROM THE THERMOSTAT
TO THE COMPRESSOR SAFETY SWITCH AND FROM THE SAFETY SWITCH TO THE COMPRESSOR.
BE CAREFUL TO ENSURE THAT THIS WIRE IS NOT PINCHED OR IN A POSITION TO RUB ON A SHARP
EDGE AS IT GOES THRU THE FIREWALL. AN OPTIONAL VACUUM RESERVOIR WITH CHECK VALVE
WILL HELP SYSTEM WORK UNDER A VARIETY OF CONDITIONS.
(VINTAGE AIR PART #31200-VUS
VACUUM RESERVOIR).
#6 O-RING
#8 O-RING
#10 O-RING
SUPPLIED OIL
FOR O-RINGS
O-RING,
SLIDE OVER
MALE INSERT
TO SWAGED LIP
FIGURE 3A
O-RING/FITTING INSTRUCTIONS
HOLD
TO
RESIST
TWISTING
LUBRICATE
O-RINGS
#6 LIQUID
HOSE
#10 SUCTION
HOSE
TIGHTEN
#6 HOSE
#10 HOSE
PRESS TAPE