Viking Access Systems i-8 Installation Instructions And Safety Information Download Page 6

TECHNICAL SUPPORT 1 800 908 0884

2

WARNING - Not following these instructions may cause severe injury or death to persons.

IMPORTANT SAFETY INFORMATION

IMPORTANT SAFETY INFORMATION

IMPORTANT SAFETY INSTRUCTIONS

WARNING – To reduce the risk of severe injury or death:

1.

READ AND FOLLOW ALL INSTRUCTIONS.

2. Never let children operate or play with gate controls. Keep the remote control away from children.

3. Always keep people and objects away from the gate. 

NO ONE SHOULD CROSS THE PATH OF

THE MOVING GATE

.

4. Test the gate operator monthly. The gate 

MUST

reverse on contact with a rigid object or when

an object activates the non-contact sensors. After adjusting the force or the limit of travel,
retest the gate operator. Failure to adjust and retest the gate operator properly can increase the
risk of injury or death.

5. Use the manual release only when the gate is not moving.

6.

KEEP GATES PROPERLY MAINTAINED.

Read the owner’s manual. Have a qualified service per-

son make repairs to gate hardware.

7. The entrance is for vehicles only. Pedestrians must use separate entrance.

8.

Every gate operator installation M

MU

US

ST

T have secondary protection devices

against entrapment, such as edge sensors and photo beams more in particularly
in places where the risk of entrapment is more likely to occur.

9.

SAVE THESE INSTRUCTIONS.

IMPORTANT INSTALLATION INSTRUCTIONS

1. Install the gate operator only when:

a) The operator is appropriate for the construction of the gate and the usage Class of the gate

(refer to page 5),

b) All openings of a horizontal slide gate are guarded or screened from the bottom of the gate

to a minimum of 4 feet (1.22 m) above the ground to prevent a 2-1/4 inch (57.2 mm) 
diameter sphere from passing through the openings anywhere in the gate, and in that 
portion of the adjacent fence that the gate covers in the open position,

c)

ALL EXPOSED PINCH POINTS ARE ELIMINATED OR GUARDED, AND

d)

GUARDING IS SUPPLIED FOR EXPOSED ROLLERS.

2. The operator is intended for installation only on gates used for vehicles. Pedestrians must be

supplied with a separate access opening. The pedestrian access opening shall be designed to
promote pedestrian usage. Locate the gate such that persons will not come in contact with the
vehicular gate during the entire path of travel of the vehicular gate.

3. The gate must be installed in a location so that enough clearance is supplied between the gate

and adjacent structures when opening and closing to reduce the risk of entrapment. Swinging
gates shall not open into public access areas.

4. The gate must be properly installed and work freely in both directions prior to the installation

of the gate operator. Do not over-tighten the operator clutch or pressure 
relief valve to compensate for a damaged gate.

5. The gate operator controls must be placed so that the user has full view 

of the gate area when the gate is moving AND AWAY FROM THE GATE 
PATH PERIMETER,

Summary of Contents for i-8

Page 1: ...VIKING VIKING BLUE ENABLED SOLAR EFFICIENT OPERATION installation instructions class I class II class III and class IV residential and commercial vehicular swing gate operator and safety information...

Page 2: ...s fulfilled with the i 8 gate operator The discreteness of the installation the flexibility of operation the efficiency of automation and the adaptability of integration makes the i 8 gate operator a...

Page 3: ...I 8 Vehicular Gate Operator Revision B3 November 2009...

Page 4: ...C 15 Optional Stainless Steel Casing and Cover I8CSSH 13 ECU Box VA ECUBB 14 Control Board Single Master Slave DUPCB10 I8 DUMSCB10 I8 15 Mounting Plate Single Master Slave ECUMPS10 ECUMPMS10 16 Toroid...

Page 5: ...p 1 through 7 Operator Installation 13 Step 8 through 9 Limit Switch Setup 14 Opening Closing Setup 15 Reference Wiring Diagram Limit Switch Connections 15 Control Box Installation 16 Electrical Insta...

Page 6: ...ONS 1 Install the gate operator only when a The operator is appropriate for the construction of the gate and the usage Class of the gate refer to page 5 b All openings of a horizontal slide gate are g...

Page 7: ...e only Omron E3K R10K4 photoelectric eye to comply with UL325 10 For a gate operator utilizing a contact sensor Edge sensor or like in accordance with section 31 1 1 of the UL325 standard a One or mor...

Page 8: ...carried out by qualified personnel In order to guarantee that the system works efficiently and correctly it is important to have the manufacturer s instructions on maintenance of the gate and operator...

Page 9: ...ed via supervision by security personnel Install the gate operator only when The operator is appropriate for the construction of the gate and the Usage Class of the gate IMPORTANT SAFETY INFORMATION I...

Page 10: ...tallation Secondary Entrapment Protection Photo beams or like must be installed to reduce the risk of entrapment Use only Omron E3K R10K4 photoelectric eye to comply with UL325 Make the electrical con...

Page 11: ...sensor Installation Secondary Entrapment Protection Edge sensor or like must be installed to reduce the risk of entrapment Use only Miller Edge 3 sided activation type MGR20 or MDS20 to comply with U...

Page 12: ...for 5 minutes or until a stop command gets actuated The Stop command can be actuated in two different forms 1 Using the Built in Stop switch on the Control Box or 2 Using an External Stop button withi...

Page 13: ...a minimum height of 5 feet so small children are not able to reach it and 3 Away from all moving parts of the gate Maximum Gate Length 12 feet Maximum Gate Weight 650 lbs Maximum Aperture Angle 110 de...

Page 14: ...13 46 16 61 STEP 1 Ensure the center of the Upper Hinge is 2 56 from mounting surface Weld in place If the hinge center is less than 2 56 form the surface clearance will have to cut into the lower mo...

Page 15: ...the Gate Operator to an area drain Ensure that the pipe has proper slope to prevent any water accumulation in the operator or adjacent area STEP 7 Ensure the Gate Operator is level in both directions...

Page 16: ...th the flats on the Gearhead STEP 11 Insert the Ball Bearing into the Intermediate Drive Arm lubricating it with silicone based grease Install the arm onto the Articulation Point of the Gate Operator...

Page 17: ...15 Route the wires for the Gearmotor through the conduit already in place Connect the two wires to the wires coming from the Control Board The Wires are color coded Black to Black Blue to Blue STEP 13...

Page 18: ...To adjust the open position stop Loosen the Open Position Adjustment Bolt Rotate the Open Position Stop so that it bumps against the Secondary Drive Arm at the desired position Rotating the Stop to m...

Page 19: ...sitions 2 Allow the gate operator to run a full open and close cycle from stop to stop without interruption 3 Allow a complete cycle from limit to limit so the operator recognizes the limit settings O...

Page 20: ...using the sealed washers provided place the rubber side of the washers against the inside of the control box Mounting Surface Control Box Sealed Washer Supplied with Unit Mounting Fastener Customer Su...

Page 21: ...e proper position 115 for 110 to 120VAC 230 for 200 to 240VAC 3 Connect the incoming power wires to the terminals as shown in the illustration 4 Turn on the main switch or breaker once the installatio...

Page 22: ...sor Hold Open Timer Stop Overlap Delay Close Open Obstruction Sensor min MAX Overlap Delay 1 5 0 3 Radio Station Safety Connector Open Commands Guard Station Master Slave GND Close Stop Open GND Close...

Page 23: ...p Obstruction Sensor Charger Brake Fail Safe Secure Slave Fail Safe Secure Master Master Open Slave Open Master Slave Power Low Battery Slave Limit Open Limit Close Slave Limit Open Limit Close Hold O...

Page 24: ...ide Re open Loop Exit Loop Make Even with Open Gate TECHNICAL SUPPORT 1 800 908 0884 20 VEHICULAR LOOP DETECTOR INSTALLATION VEHICULAR LOOP DETECTOR INSTALLATION Dimension A 5 for Single Gate Operator...

Page 25: ...p detector unit in a way to minimize the effects of the gate over the loop detector wire IMPORTANT Some of the following parameters may affect the proper functionality of the vehicular loop detector c...

Page 26: ...v Hold Open Timer Stop Close Open 30 60 Off 1 Brake Siren Exit Loop Detector Fire Override Keypad FIRE Safety Connections Radio Station Mag Lock Mag Lock Safety Connector Open Commands Guard Station M...

Page 27: ...control the gate This type of configuration is not recommended for a commercial installations Open Only 2 By having the radio receiver connected as illustrated and with the Hold Open Timer ON see belo...

Page 28: ...0 Mounting Plate Juction Box Mounting Plate Magnetic Lock Floating Plate M M 2 2 VIKING ELECTROMAGNETIC LOCK VIKING ELECTROMAGNETIC LOCK Standard Features Mounting base with electrical box 24VDC Plug...

Page 29: ...NNECTIONS Radio Station Mag Lock Mag Lock Safety Connector Open Commands Guard Station Slave Radio Rec UL Sensor OPEN RIG OPEN LEF Safety Loop Center Loop Obstruction Sensor Charger Power Low Battery...

Page 30: ...gate s movement and reverse it momentarily 2 Bring the gate to a resting position 3 Disable the Hold Open Timer feature until the Gate Operator receives a new command If another obstruction is detect...

Page 31: ...Delay 1 5 Ce Lo Hold Open Timer Stop Close Open Limit Limit 30sec 60sec off 1sec 0 3 A Master Slave control board is required to operate two gates with a single controller Gate Overlap Setting Setting...

Page 32: ...Timer Stop Close Open 30 60 Off 1 Radio Rec UL Sens Reopen Loop Center Loop Brake Siren JP3 C35 C36 The Auto Open feature in Viking Gate Operators enables the following functionality in the event of p...

Page 33: ...l turn ON indicating the Control Board is ready for use with the Viking Blue Module 6 Open Viking Blue software on the chosen device If you are using the computer Hold the computer near the Gate Opera...

Page 34: ...Motor Sensor Radio Station Loop Connector Gnd Reopen Gnd UL Gnd 28v Gnd Radio Gnd 28v 28v Mag Lock Fail Safe Secure MAG LOCK N C COM N O Charger Power Low Battery Check Motor Radio Rec UL Sens Reopen...

Page 35: ...r Radio Rec UL Sensor OPEN RIGHT 24V BAT 24VAC OPEN LEFT Charger Power Low Battery Motor Sensor Radio Station ctor Mag Lock l cure MAG LOCK N C COM N O Charger Power Low Battery Check Motor Radio Rec...

Page 36: ...d cables Check the voltage of the battery Gate does not run Obstruction sensor ON and audio alarm is SOUNDING Ensure that the gate path is clear of obstructions Note To stop the audio alarm use the st...

Page 37: ...lose is set by the trim pot To turn this system off turn the trim pot all the way clockwise Gate opens in the opposite desired direction Verify your motor cable is connected to the proper connector Re...

Page 38: ...earning algorithms redundancy design in both hardware and software to ensure operation and functionality protection from lightning short circuit and power surges and our exclusive helical gearing offe...

Page 39: ...stop self adjust system Modulated speed regulator prevents exceeding operating speed that may reduce the service life of the gate operator and or installation Intelligent obstruction detection with ad...

Reviews: