VZ-WM60
Page 8
Visit the ViewZ website at http://www.viewzusa.com
Installation Instructions
Step 6. Once all of the anchors are in place, move the
wall plate back into position.
Step 7. Attach nuts and washers to the threaded shafts
that are protruding from the wall. Level the
mount one more time and then tighten the nuts.
Do not overtighten the wedge anchors.
Threaded Shaft
Mounting Hardware
Wall Plate
Socket Wrench
Solid
Surfa
ce
Cinder
Blo
ck
Determining the Mounting Hardware
Step 1. Insert the thread depth indicator (supplied) through the thread inserts found on the back of the flat panel.
Step 2. Using a pencil, mark the depth of the thread insert on the thread depth indicator (Figure 2).
Step 3. Compare and verify the depth of the remaining thread inserts.
Step 4. Locate the correct diameter screw for the thread insert.
Step 5. Compare your thread depth indicator marking to the screw length.
Figure 1
Figure 2
Figure 3
Inverted Flat
Panel Display
Marking the
Depth
Thread Insert
Thread Depth
Indicator
Thread Depth
Indicator
Marking
Screw
Marking
Screw
Thread Depth
Indicator
When using the universal spacers in
the installation, make sure to account
for the appropriate spacing depth
when measuring with the thread depth
indicator. Using the universal spacers
will change the overall length of the
hardware used.
If your selected screw is longer than
the marking on the thread depth
indicator, do not use this screw. The
screw length must not bypass the
marking. If so, select another screw
size (Figure 2 and 3) until you find the
screw the comes closest to your mark
without going past the marking.