![background image](http://html.mh-extra.com/html/viewsonic/ld-stnd-003/ld-stnd-003_quick-start-manual_1022077006.webp)
ENGLISH
6
Connecting the System Control Box to the Floor Base
1. Carefully unfold the System Control Box panel. Ensure the main system control board
is on the left.
NOTE:
Use caution as the System Control Box panel is separated into two pieces with
wires attached.
2. Align the System Control Box to the six (6) holes on the Bottom Cross Beam and se-
cure it with six (6) M6x10mm screws.
3. Install two (2) additional screws (M6x10mm) to connect the two halves of the System
Control Box.
NOTE:
Screws (M6x10mm) are placed in the accessory box of the LED Display.
Summary of Contents for LD-STND-003
Page 17: ...5 繁體中文 3 使用四 4 支 M6 x 80mm 螺栓將上橫樑 F 連接至左支撐架和右支撐架 3 4 F 4 使用內六角扳手正確鎖緊所有螺栓 2 4 A E ...
Page 19: ...7 繁體中文 安裝中間機櫃 1 確保兩 2 個中間機櫃後側的兩 2 個安裝架 位於下圖所示位置 2 小心將機櫃抬到落地支架上 將安裝架固定至上橫樑的支撐通道 機櫃的底部 將置於下橫樑上 ...
Page 29: ...5 简体中文 3 使用四个 4 M6 x 80mm 螺栓将顶部横梁 F 连接至左右支撑 3 4 F 4 务必使用艾伦扳手将所有螺栓正确拧紧 2 4 A E ...
Page 122: ......