23
Commissioning must be carried out by the IT expert or
system integrator.
1.
Switch on the heat generator.
2.
Switch on the power supply for the gateway.
3.
After switching on, the following LED indicators
should be displayed. See table.
If the LED indicators do not match the table, check
the connections against page 13.
LED indica-
tors
Required display after commis-
sioning
SYS
Green
RUN
Green
I/O
Green
MS
OFF
NS
OFF
USR
Green
4.
For further commissioning steps, see the "WAGO
KNX automation gateway commissioning manual"
at
Commissioning and adjustment
Commissioning the gateway
5853847
Service
Summary of Contents for WAGO KNX/TP gateway
Page 25: ...25 Dismounting the KNX terminal 1 2 4 3 Fig 19 Dismounting the gateway cont 5853847 Service...
Page 26: ...26 Dismounting the CAN terminal 2 1 Fig 20 Dismounting the gateway cont 5853847 Service...
Page 27: ...27 Dismounting the controller 1 3 2 Fig 21 Dismounting the gateway cont 5853847 Service...
Page 28: ...28 1 2 Fig 22 Dismounting the power supply unit 5853847 Service...
Page 34: ...34 5853847...
Page 35: ...35 5853847...