Installation on Flat Roofs
28
Installing the Mounting Rails
(continued)
Turn T-slot bolt
90°
for all installation
steps.
1.
Position ballast weights on a solid
surface on protective mats.
2.
Attach clamping brackets
to
ballast weights
and
; do not yet
tighten the bolts.
3.
Click the mounting rails
into the
clamping brackets
, align and
tighten.
Dimensions
a
inches
mm
7.4
187.5
b
inches
mm
64.0
1650
c
inches
mm
7.4
187.5
4.
Secure the retaining plates
to the
mounting rails
.
5.
Fit clamping brackets
onto the
mounting rails
; do not yet tighten
the bolts.
6.
Click the mounting rails with tube
holders
into the clamping brackets
, align and fasten.
The tube holders on the installation rails
must be in alignment with those in the
connection housing; align with string if
necessary.
Note:
Please see page 25 for numbered parts
description.
5
3
6
8
5
3
8
v
1
.1
2.
3.
a
b
c
2x
4.
5.
6.
90º
90º
9.1” /
230mm
IMPORTANT
Summary of Contents for VITOSOL 200-T SD2A 2m2 Series
Page 51: ...51 5368 538 v1 1 ...