6
Commissioning steps
Inspection steps
Maintenance steps
Page
•
1. Checking pressure conditions and adjusting the pre-charge pressure of the
expansion vessel if necessary
............................................................................................
7
•
•
•
2. Checking the safety equipment function
...........................................................................
8
•
•
•
3. Checking the electrical connections
..................................................................................
8
•
4. Filling and flushing the solar thermal system and checking for leaks
...........................
8
•
•
•
5. Determining the flow rate and adjusting if required
.........................................................
9
•
•
6. Performing a test flush
........................................................................................................ 10
•
•
7. System start-up
.................................................................................................................... 11
•
•
•
8. Checking the switching function of the solar control unit
............................................... 11
•
•
9. Checking and replacing the heat transfer medium if required
........................................ 11
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
5675 801 GB