14
Commissioning steps
Inspection steps
Maintenance steps
Page
•
•
•
1. Commissioning the system
............................................................................................... 15
•
•
2. Shutting down the system
................................................................................................. 16
•
3. Removing the burner (if required)
.................................................................................... 16
•
4. Type M148: Moving the hinge brackets to the other side of the boiler door
................ 17
•
•
5. Opening the boiler door(s)
................................................................................................ 20
•
•
6. Removing the closures of the inspection ports
.............................................................. 21
•
7. Removing and cleaning the turbulators (if installed)
..................................................... 21
•
8. Cleaning the heating surfaces and flue gas collector
.................................................... 21
•
•
•
9. Checking the gaskets and packing cords on the flue gas side
•
•
10. Cleaning the sight glass
.................................................................................................... 21
•
•
•
11. Checking the thermal insulation components and gaskets
........................................... 22
•
•
•
12. Inserting turbulators (if installed) and closing the boiler door(s)
................................. 23
•
•
•
13. Closing and securing the inspection ports
..................................................................... 24
•
•
14. Mounting the burner (if required)
..................................................................................... 24
•
15. Checking the water chamber for deposits
....................................................................... 24
•
•
16. Checking the connections and inspection ports on the water side for leaks
.............. 24
•
•
•
17. Checking the water level and system pressure
•
•
•
18. Checking the safety and control equipment
.................................................................... 25
•
•
•
19. Checking the safety valve
................................................................................................. 25
•
•
20. Checking the water quality
................................................................................................ 25
•
•
21. Checking the thermal insulation
•
•
•
22. Checking the installation room ventilation
•
•
•
23. Checking the flue pipe for tightness
•
•
24. Adjusting the burner
.......................................................................................................... 26
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
5673144