3 Vitolig 300
A
approx. 3000
min. 100
E
D
C
F
approx. 2000
B
*
1
*
1
11
3.2 Positioning
H
No air contamination through
halogenated hydrocarbons (e.g. as
contained in sprays, paints, solvents
and cleaning agents).
H
Avoid very dusty conditions.
H
Avoid high levels of humidity.
H
Avoid danger of freezing and ensure
good ventilation.
Otherwise the system may suffer faults
and damage.
The boiler may only be installed in
rooms, where air contamination through
halogenated hydrocarbons may occur,
such as through hairdressing salons,
printing shops, chemical cleaners,
laboratories etc., if adequate measures
can be taken to provide uncontaminated
combustion air.
If in doubt, please contact us.
If these instructions are not observed, any
consequential damage to the boiler
directly related to any of these causes,
are excluded from our warranty.
Installation example − system with fully automatic pellet feed
*1
Example, dimensions not binding
A
Fully automatic pellet feed
B
Changeover unit
C
Fill and return air adaptor
(Storz couplings)
D
Timber planks
E
Suction wands
F
Deflector
5822241 GB
*1
Required for cleaning and manual venting
*2
Required for the removal of the worm−drive
*3
With fully automatic pellet feed
*4
Without fully automatic pellet feed
*5
Required for the removal of the ash container
200
650
1285
930
500
120
400
721 (8−26 kW)
656 (5−15 kW)
*6
For the installation of the fully automatic pellet feed
Boiler with fully automatic pellet feed
2010
400
*6