Commissioning steps
Inspection steps
Maintenance steps
Page
•
1. Filling the heating system on the heating water side
.....................................................
•
•
•
•
•
•
4. Cleaning the heating surface
............................................................................................ 10
•
•
5. Checking gaskets and thermal insulation sections
........................................................ 11
•
•
•
•
7. Separating the neutralising system or active charcoal filter (if installed) from the
boiler and connecting the drain hose
.............................................................................. 12
•
•
8. Checking the neutralising system (if installed)
............................................................... 12
•
•
9. Checking the active charcoal filter (if installed)
.............................................................. 12
•
•
10. Cleaning the condensate drain pipe and trap and reconnecting to the drainage
•
•
11. Checking the connections on the flue gas side for tightness
....................................... 13
•
•
•
12. Checking the connections on the heating water and DHW sides for leaks
•
•
•
13. Checking the safety valve function
•
•
14. Checking the diaphragm expansion vessel and system pressure
................................ 13
•
•
•
15. Checking the thermal insulation for firm seating
•
•
16. Checking the mixer for ease of operation and tightness
............................................... 14
•
•
•
17. Checking the ventilation air connection on the burner (if installed)
............................. 14
•
•
•
•
19. Instructing the system user
.............................................................................................. 14
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance