21
Fig. 25
Lay-outs of Vitogas RS-50 gas boilers – front elevation. Boiler
s shown with front access panel removed
(Dimensions in imperial and metric)
C
D
26
´ 10
˝ (8179mm)
6
˝ (150mm)
24
˝ (610mm)
Two standard right hand side
configuration
Two left hand side configuration
Left hand side configurations have to
be specified at time of ordering.
Note: For layout D, pressure relief
valve, air vent and pressure gauge
have to be mounted on supply
piping.
23
´ 10
˝ (7264mm)
10
´ 11
˝ (3527mm)
L.W.C.O.
Pilot
Pilot
Pilot
Pilot
Pilot
Pilot
Pilot
P
ilot
L.W.C.O.
L.W.C.O.
L.W.C.O.
L.W.C.O.
L.W.C.O.
L.W.C.O.
L.W.C.O.