Commissioning steps
Inspection steps
Maintenance steps
Page
•
1. Filling the heating system with water and venting
.........................................................
•
2. Filling the trap with water
..................................................................................................
•
•
•
...............................................................................................
•
•
•
4. Where present: Check motorised flue gas damper (flue gas cascade accessory).
•
•
6. Conversion to natural gas L
.............................................................................................. 11
•
•
8. Reducing heating output (if required)
.............................................................................. 14
•
•
•
9. Checking static pressure and supply pressure
.............................................................. 15
•
•
•
10. Checking the CO
................................................................................................. 16
•
•
•
•
12. Checking the flue gas temperature
.................................................................................. 20
•
•
13. Displaying the ionisation current
..................................................................................... 20
•
•
................................................................................................. 21
•
•
•
•
16. Cleaning the combustion chamber and heating surfaces
............................................. 21
•
•
17. Checking the gaskets and thermal insulation sections
................................................. 21
•
•
18. Checking all connections and the sensor well on the heating water side for
•
•
19. Cleaning the condensate drain pipe and trap
................................................................. 23
•
•
20. Checking the condensate drain and neutralising system (if installed)
•
•
21. Checking the burner gauze assembly
.............................................................................. 24
•
•
22. Checking the ignition electrodes and ionisation electrode
........................................... 25
•
•
•
•
•
25. Control cables connection diagram
................................................................................. 27
•
•
•
•
27. Checking the gas train valves for tightness
.................................................................... 31
•
•
28. Checking the gas train filter element
............................................................................... 31
•
•
29. Checking the filter element in the gas line
...................................................................... 31
•
•
•
30. Checking gas connections for tightness
......................................................................... 32
•
•
31. Checking the gaskets on the flue gas side
...................................................................... 32
•
•
•
33. Checking the water quality
................................................................................................ 33
•
•
•
34. Checking the safety valve function
•
•
35. Expansion vessel
•
•
36. Checking the mixer for ease of operation and leaks
...................................................... 33
•
•
•
37. Checking the thermal insulation for firm seating
•
•
•
38. Checking the installation room ventilation air/extract air apertures
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance