
7
Commissioning steps
Inspection steps
Maintenance steps
Page
•
•
•
1. Commissioning the system
...............................................................................................
8
•
•
2. Shutting down the system
.................................................................................................
8
•
•
3. Opening the boiler door and cleaning cover
...................................................................
9
•
4. Cleaning the turbulators, heating surface, flue outlet and flue pipe
............................. 10
•
•
•
5. Checking all gaskets and packing cords on the flue gas side
•
•
•
6. Checking the thermal insulation components on the boiler door
•
7. Inserting the turbulators
.................................................................................................... 10
•
•
8. Securing the boiler door and cleaning cover
.................................................................. 11
•
•
•
9. Checking the temperature controller setting if a building management system is
used (DCC system)
............................................................................................................ 12
•
•
•
10. Checking all connections on the heating water side and the sensor well for leaks
•
•
•
11. Checking the function of safety equipment
..................................................................... 12
•
•
•
12. Checking the function of the pressure switch
................................................................ 12
•
•
•
13. Checking the expansion vessel and system pressure
................................................... 12
•
•
•
14. Checking electrical plug-in connections and cable grommets for firm seating
•
•
•
15. Checking the thermal insulation for firm seating
•
•
16. Checking the water quality
................................................................................................ 13
•
•
17. Cleaning the sight glass in the boiler door
...................................................................... 14
•
•
•
18. Checking the mixer for ease of operation and tightness
............................................... 14
•
•
•
19. Checking the function of the return temperature raising facility (if installed)
•
•
•
20. Checking the installation room ventilation
•
•
•
21. Checking the flue pipe for tightness
•
•
22. Adjusting the burner
.......................................................................................................... 14
•
23. Operating and service documents
................................................................................... 15
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
5461424