6
Note
The hinge pins can be repositioned so that the boiler
door opens to the left.
700
600
(300)
500 (50)
500 (50)
200 (100)
810
A
B
C
Fig. 1
A
Boiler
B
Burner
C
Anti-vibration boiler supports
Dimensions in brackets are minimum clearances.
500
(300)
Fig. 2
Clearance for vertical flue gas pipework (min-
imum dimension in brackets)
Note
With vertical flue gas routing, take into consideration
the space required for working on the control unit.
c
e
d
Fig. 3
Anti-vibration boiler supports
Permissible load
kg
2970
c
front, length/number
mm/pce
125/2
c
back, length/number
mm/pce
667/2
d
front/back
mm
30/100
e
(unstressed)
mm
41
e
(stressed)
mm
38-39
Thermal insulation components
The thermal insulation and casing are supplied in 2
packs. The following is a list of the components in the
individual packs.
Note
The position numbers correspond to the "Thermal
insulation assembly" parts list in the service instruc-
tions.
Clearance dimensions
5816716
Summary of Contents for CRU
Page 22: ...22 1 1 2 3 4 4 Fig 18 Note Use self tapping screws 7 4 8 Fitting the side panels 5816716 ...
Page 34: ...34 3 4x 2 4 2x 5 1 4x Fig 32 Fitting the front side panels 5816716 ...
Page 37: ...37 Vitocrossal type CRU service instructions Commissioning 5816716 ...
Page 38: ...38 5816716 ...
Page 39: ...39 5816716 ...